9/17/2024 14:12:52 Closed by Cheyenne Bowlen
Patricia, the asphalt will be milled before the street is resurfaced.
Other: Noticed today that my street Spicewood Lane is likely being repaved. The asphalt in front of my driveway for 2519 S Spicewood lane is already highly built up and causes any non-SUV vehicles to bottom out. I wanted to verify that the asphalt (or at least in front of the drives) would be cold planed (ground down) to minimize the height differences so that the problem is not made even worse.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 0 days have already passed.
Patricia, the asphalt will be milled before the street is resurfaced.