1/27/2017 11:27:45 Closed by Anonymous
I spoke with Eric Ferree with Vectren and they will get the issue taken care of. They were using cold-patch asphalt and it wasn't doing the job so a more permanent solution will be employed.
Other: There has been a utility cut on E Second, between Eastside Drive and Rose. It was filled in very poorly so now there is an ugly hole in the pavement .
Most tickets of this type should be closed within 7 days, although some cases may be longer. 6 days have already passed.
I spoke with Eric Ferree with Vectren and they will get the issue taken care of. They were using cold-patch asphalt and it wasn't doing the job so a more permanent solution will be employed.