closed #192666
Utilities Construction
1415 E Hunter AVE
- Case Date:
- 8/4/2024
Fiber install hit water line. Lots of water leaking
Fiber install hit water line. Lots of water leaking
I would like to know when the barrier and repair of water turn off in from of my house will be repaired. It has been several years and thereis a big hole in the area with a barrier, however, I hope no one falls in it. I think it is time to repair or whatever you are going to do with the hold. it has been years now
We will not use garbage collection service for several months, but City will still charge us for the service unprovided, only because your billing system was set up that way. Is this legal to charge residents for the service you are not providing ? Sounds ridiculous and illegal. Hope Mr. Mayor could see to it and step in for a immediate correction. Thank you.
Water near hydrant all the time. Either slow leak or natural spring?
water meter cover (??) missing on sidewalk on the west side of college, just north of the train bridge (about a block south of 14th st). trip hazard. not sure if it was removed for construction or what but it's been gone for about a month. thanks!
The company, installing fiber optic cables on my St., South, Lori Lane, destroyed my drainage that goes underneath my driveway. We are in a flood zone, and if this isn’t corrected my driveway, which is gravel, will wash away. I’m really shocked how careless the company was in excavating my property without fixing it. My house is at 80 S. Lori Ln.
Cbu replaced 3 hydrants during main replacement. These areas need to be replanted . Additionally during one replacement irrigation damage resulted in a $400 charge for repair. We request reimbursement
Grass killed by large piece of equipment left on the turf which should have been left on the street. This occurred during water main replacement over late summer. Requesting repair
There is a large construction caution sign that was left standing next to the sidewalk by the fiber optic installation crew. It has been here now for over 2 weeks without any obvious work still going on.
Not sure who to contact for fiber installation issues. The workers installed a plastic access pipe in my front yard in the corner of driveway and sidewalk. Inevitably, a large truck is going to drive over it and crush it, potentially damaging the fiber. They removed the tarp with dirt, so I a now assume they are done? Would like to see this access moved farther from driveway.