Potholes, Other Street Repair
2127 E 5th ST
- Case Date:
- 7/12/2022
5th Street between Jefferson and Union streets is beyond the repair of simply fixing pot holes. Some of the damage on the street is due to property owners fixing their sewer lines and then not repaving the street.
Potholes, Other Street Repair
506 N Adams ST
- Case Date:
- 7/15/2022
The at-grade railroad crossings on N Adams and on Fountain Drive are in deplorable shape. Is the city responsible for these, or the Indiana railroad Company? There are many crossings in Bloomington and most of them are fine. These crossings are in a lower income neighborhood so I'd think the city, with its focus on equity and social justice, would be very interested in getting these improved.
Potholes, Other Street Repair
1221 N Lindbergh DR
- Case Date:
- 7/20/2022
As a rider on the 2W bus I am writing in regards to the deterioration of Lindbergh Dr. This road/hill is driven by the 2W bus and it has so many potholes and rough spots that it has almost become torture to ride the bus. The problems start at the bottom of the hill by 17th street and continue up the hill to Oolitic DR. This has been causing pain with the riders. I myself have horrible back pain as does family. We sometimes walk 4 blocks to another bus stop just to avoid having to ride up that hill.
Potholes, Other Street Repair
2910 W 3rd ST
- Case Date:
- 7/21/2022
Big pothole along the southbound lane of Franklin Road, right by the McDonald's. There are other potholes along Franklin Road that need to be filled.
Potholes, Other Street Repair
1009 W 11th ST
- Case Date:
- 10/28/2023
Two new potholes opened up, hoped they could be patched before winter. THANK YOU!!
Potholes, Other Street Repair
827 W 11th ST
- Case Date:
- 10/29/2023
Small pothole in front of driveway at 11th and Blair. Hopefully can be repaired before winter!
Potholes, Other Street Repair
1016 W Kirkwood AVE
- Case Date:
- 11/1/2023
There are two potholes in the eastbound lane of West Kirwood Avenue by Rose Hill Cemetery that are growing rapidly. Road base material is exposed.
Potholes, Other Street Repair
3449 E Longview AVE
- Case Date:
- 11/7/2023
Street repaving request for East Longview Ave.
Looking for the 2024 paving schedule, may not be released yet.
East Longview needs paving through its full length within Park Ridge, from N. Glenwood West through to N. Glenwood east cross streets. This would accomplish:
-Repaving needed overall
- Install updated traffic calming bump design replacing current full width bumps.
-Stripe the bike path lane stripe as it's part of the E-W bike greenway.
And thanks! for placing the stop stripes at the 4-way stop E. Longview and N. Glenwood west by the park.
We have a significant issue with motorists running that stop sign by the park entering the neighboorhood. We appreciate your good work.
Potholes, Other Street Repair
1212 N Grant ST
- Case Date:
- 11/13/2023
The alley to the north of 1212 N Grant has several very large pot holes
Potholes, Other Street Repair
4325 E Weymouth LN
- Case Date:
- 11/28/2023
Weymouth Lane is in poor condition with potholes and cracks. When does the city plan to repave Weymouth?
Thank you.