closed #58006
Sewer Problems (Sanitary Sewers)
2543 S Elm Leaf DR
- Case Date:
- 5/28/1999
Sewer odor in home.
Sewer odor in home.
Mr. David Randolph (of IIG, Inc.) stopped in to complain that his water was shut off due to delinquency on a $30.00 acct. The shutoff cost him over $600.00 in loss of production. Mr. Randolph stated the shutoff could potentially have cost him machinery of plus pose an environmental hazard.
Sewer backup.
Wants storm drain checked. He says it overflows during heavy rain.
Sewer backup
METER LID IS LOOSE AND HER CHILD CAN LIFT THE LID UP
STORM RAIN PIPE PROBLEMS IN REAR YARD, HE HAD CALLED TWO WEEKS AGO, NOTHING DONE, WHEN WILL IT BE DONE
STORM DRAIN COLLAPSING.
SEWER N OF WHERE CBU REPAIRED SEWER IN JANUARY IS CAVING IN
WHEN YARD CREW WAS REPAIRING YARD, DAMAGED INVISIBLE FENCE.