closed #207539
Trash
710 E Maxwell LN
- Case Date:
- 1/11/2026
Not an emergency. My recycle bin top was damaged by the pickup truck and needs a new on installed. It just flops around on it now
Not an emergency. My recycle bin top was damaged by the pickup truck and needs a new on installed. It just flops around on it now
Sare road is nothing but ice, especially at intersections and also by mall. Are you all on strike? Worst street conditions ever in all my years living here. Usually you are on the ball. Please salt.
potholes
Followup on a reply to a previous report. I suggested a bridge to finally silvestre this crossing problem. Reply was that a Boy Scout was going to do it (Eagle Scout project?). Is that still going to happen? Is he raising money, getting materials, etc? The previous solutions hace been short-term. A well-constructed bridge could get it done to last.
Car has been broken down in the alley running behind Cherokee for almost a week, rendering the alley unusable for those that live there.
We had a large truck hit and break a limb off the tree to the right of our driveway. This happened once before and you guys came out and took care of it. This is not an emergency and I have moved the limb out of the street. Thanks! Andy
Tree was marked to be cut down almost a year ago. Half knocked down in the storm last night. Please, please come cut it down. Its been a year!
My garbage can, which is used for weekly trash pickup, has been stolen. My recycling is still here, but my garbage can is just gone.
Trash and recycle containers placed out Wednesday evening. Looks like one or two items were removed from each container leaving both containers nearly full.
We have a vendor scheduled to replace a retaining wall at the corner of 2nd and Grant that is failing and bowing out. We sent the engineering department some concerns that we want to share here as well. 1. The stop sign is currently located approximately one foot from the retaining wall. There is concern that the sign may become unstable or fall once the wall is removed. 2. Once the project is completed, the bank will be lowered, which may require adjustments to the placement or height of the stop sign. Please let me know how you would like to proceed or if additional coordination is needed to address these concerns.