City Construction Projects
423 E Kirkwood AVE
- Case Date:
- 7/2/1998
Mr. Madsen called to express his concern about the efficiency of tax money on the sidewalk sweeper the City just purchased. He believes the City merchants should sweep their own sidewalks, and in the winter should shovel their own walks to better promote people to use the dowtown area. This was just a general complaint to voice his concern.
City Construction Projects
401 N Morton ST
- Case Date:
- 5/25/2005
citizen querried in re plans for improvement for three locations: rodgers rd between sare and snoody, olcott in hyde park, and generally potholes throughout the city. said they were "aweful".
City Construction Projects
5717 S Rogers ST
- Case Date:
- 2/24/1998
Mr. Stidd called and said that the road at 5717 S. Rogers was supposed to have been cleaned up by CBU contractor, but it is extremely dusty and dirty.
City Construction Projects
- Case Date:
- 12/14/2021
Mike Morris (917-538-5927) called about a tree that fell on the multi-use path handrail on Rogers, just east of High. He mentioned it happened months ago and wanted to know when it will be repaired.
City Construction Projects
1427 W Allen ST
- Case Date:
- 1/1/2022
Please have public streetlights installed at the entrance of Whittington Commons on Allen Street. It is very dark, and it is difficult to see entrance. I know this is a private road within WC, but Allen is a public street and it is a hazard to not have streetlights at entrance given the public sidewalk crosses the entrance. Light it up!
City Construction Projects
105 W 4th ST
- Case Date:
- 1/12/2022
Level 1 stairway exit (alley way access) - Standpipe (Fire Dept.) leaking and water is accumulating on landing in front of exit door, may ice as temps fall.
City Construction Projects
- Case Date:
- 4/20/2022
The city recently replaced worn some worn curbs and this week repaved a big section of Park Ridge Road in Park Ridge East. The crew did an exceptional job! However, on the east side of the street between the park and Sheffield Drive there is a considerable amount of chunky gravel and dirt left on the sidewalk. Will the city please send someone to clean it up? Thank you so much.
City Construction Projects
214 E 15th ST
- Case Date:
- 4/20/2022
Construction site utilizing alleyway creating potholes and divots
City Construction Projects
2225 S High ST
- Case Date:
- 4/23/2022
A new walkway and rail was installed in 2020 along Rogers Road to make it safer for children to walk to school. Shortly after it was completed a tree fell and damaged the railing for a bridge which is about 15 feet above Jackson Creek. The tree was removed but the railing was not repaired, it was simply wrapped with caution tape. This may have been adequate temporarily but it has been left this way for over a year. This is unsafe and an eyesore. Can you please arrange to have this properly repaired?
City Construction Projects
- Case Date:
- 6/14/2022
Location, Ticket 180318, NW corner N Park Ridge Rd & E Cambridge Dr. Perhaps others?