City Construction Projects
100 E 6th ST
- Case Date:
- 4/7/2000
due to the project at 7th and Walnut the lack of striping in the 100 Block of E. 6th is even more critical than before. Please ASAP stripe the angle parkinging in the 100 jBlock of E. 6th.
City Construction Projects
1809 E Southdowns DR
- Case Date:
- 10/4/1999
STREET CUT STILL NEEDS REPAIRED WHERE CBU REPAIRED MAIN BREAK
City Construction Projects
309 N Walnut ST
- Case Date:
- 6/16/1999
sidewalk torn up in the 300 block, in front of Taco Bell (think by gas company) and was never repaired. Has been out for awhile and is a hazard to pedestrians (Carol I also think they did not repair the sidewalk next to Alice's house on Morton and 10th. You may want to address both of these walks with them)
City Construction Projects
E COVENANTER DR
- Case Date:
- 10/9/1996
It is Mike's understanding that Covenanter Dr. is not to be used as an access road for construction of condos south of Eton Mews. Mike saw two dump trucks go through this morning that he thinks belongs to Rogers Group.
City Construction Projects
S ROCKPORT RD
- Case Date:
- 9/18/1997
Rockport between 37 and Country Club has become very hazardous during the detour. Tapp Rd construction has taken far too long for the size of the project. Its not a long section of road. why hasn't this project been finished and reopened? If there's a valid problem, city or county should monitor the traffic.
City Construction Projects
S COLLEGE AVE
- Case Date:
- 9/8/1997
Citizen says City has shown poor planning by closing off College Ave right when all the students have come back, and when 4th street is also closed for a project. Why couldn't this have been done earlier in the summer when traffic wasn't so bad? College is one of the busiest streets in town and this should have been anticipated and planned better. Note: This is FYI only, citizen did not want a response.
City Construction Projects
S COLLEGE AVE
- Case Date:
- 9/8/1997
Citizen says City has shown poor planning by closing off College Ave right when all the students have come back, and when 4th street is also closed for a project. Why couldn't this have been done earlier in the summer when traffic wasn't so bad? College is one of the busiest streets in town and this should have been anticipated and planned better. Note: This is FYI only, citizen did not want a response.
City Construction Projects
401 N Morton ST
- Case Date:
- 9/5/1997
Steve does not understand why contruction projects around campus and the kirkwood area begin exactly when the students return to school. Why don't they start in the summer when there is much less traffic?
City Construction Projects
304 S Rogers ST
- Case Date:
- 8/28/1997
After traffic calming device was installed at the corner of 3rd and Rogers, sidewalk had to be realigned. Realigning meant tree had to be dug up and the lawn in this area was never fixed.
See letter
City Construction Projects
409 E Southern DR
- Case Date:
- 8/26/1997
Ms. Costley owns the above rental property. Wants to know if the area between the street and lawn where recent work was done will be seeded and strawed. Utilities says this work was on storm sewers in conjunction with Hillside work.