closed #159564

City Construction Projects

Case Date:
6/7/2017

Hunter and Eastside

closed #159806

City Construction Projects

201-251 North Lincoln Street

Case Date:
6/21/2017

Hi, There's a couple of large road cuts at the intersection of Lincoln and 6th St. If the city is not planning on filling these any time soon could we at least get the sharp edges softened? Sometimes I've seen this done and it makes road cuts much easier to drive over without damaging your tires. Thanks, Vickie Nelson Bloomington

closed #160285

City Construction Projects

4021 E Morningside DR

Case Date:
7/25/2017

I just took possession of a home I bought as sidewalk construction on E. Morningside was being completed. The home is at 4021 E. Morningside. It is my understanding the City redid part of the driveway after having to destroy it for sidewalk work. Unfortunately it appears a corner of the drive (front right / SE) is already cracking/chipping/spalling (see photo). I'm requesting the City patch this up before it continues to flake (not huge now but would like addressed so as not to spread) as an area driven over frequently. Otherwise looks fantastic and very happy with the new sidewalk and drive portion. Great neighborhood addition.

closed #160679

City Construction Projects

1106-1112 South Graywell Drive

Case Date:
8/16/2017

Does the city have a plan for taking in, and disposing of, our old trash bins and cans? Saying that "Residents are encouraged to reuse their old trash cans as yard waste containers" seems ingenuous. How long a yard waste season goes Bloomington have? -- 6 months? Where will I store 2 35-gal. cans and a 20-gal., plus the 3 bins currently used for recycling -- since my garage will be filled up with two 64-vallon containers?

closed #161480

City Construction Projects

Case Date:
10/9/2017

I live at 712 North Washington. I asked for a medium size recycling bin and I got a small one. How can I exchange it? Also my recycling bin was left in the street by the sanitation worker. Is this the new policy?

closed #161648

City Construction Projects

Case Date:
10/24/2017

Residents on my street (Autumn Drive) left old trash cans out to be picked up for the first three weeks of the new sanitation program, but none of them were picked up. Why? Should we continue setting them out every day?

closed #161969

City Construction Projects

Case Date:
12/10/2017

Thank you for new trash/recycling system. It is convenient. I don't have to carry heavy bins. No sorting needed. I'm grateful!

closed #128329

City Construction Projects

100-198 E Smith Ave

Case Date:
8/31/2012

It is not as safe as it should be to drop off and pickup students at the project school. The construction and parent traffic is directed to the alley between walnut street and Washington street. Often this vehicle traffic fails to yield to pedestrians making walking with children very worrisome.

closed #129266

City Construction Projects

Case Date:
10/16/2012

i noticed a very dangerous situation that needs to be fixed. on the old part of west 3rd street that is still 2 lanes, beside the cresent donut shop, it is very narrow there, & i noticed that the edge of the street there is crumbling away. when it starts snowing in a month or 2, it will be even more dangerouse, because as the snow accumulates it can form a false shelf effect. in other words, the street there could look wider than it really is, so a driver could easily go over the edge & down into a little creek under there. please fix. thank you

closed #131167

City Construction Projects

1016 S Mitchell ST

Case Date:
4/2/2013

A new sidewalk in this area was installed, but the road doesn't seem to be finished. There are huge potholes and it is unsafe for bikes, pedestrians, and vehicles.