closed #36516
City Construction Projects
2215 W 3RD ST
- Case Date:
- 6/16/2004
Mr. Potter expressed disapproval and a desire for the West Third Street Phase II project to utilize two way left turn lanes instead of a raised median.
Mr. Potter expressed disapproval and a desire for the West Third Street Phase II project to utilize two way left turn lanes instead of a raised median.
Deb McMullen is upset that the city has spent all this money on the College Mall Road project, and the best the city could come up with was restricting only one business, namely Dr. Steeles, to no entry from the south. She says that it looks bad on the department.
Desires a cleanout for the slotted drain in the driveway. Desires a tree well for the gum tree on north side of drive. Desires drainage improvements on the southeast side. Desires opening in the median.
Letter stated Mr. Schatz feels that a crack (leak) in his pvc pipe connector to meter was caused by damage during construction. Customer had break repaired but received extra large water bill. Wants matter investigated and adjustment made.
Fax was received stating that Mike and Julie Donham were upset with the final yard work at 515 S. Washington St. in Bloomington, IN. They feel add'l. topsoil and seeding are needed along sidewalk and 2 depressesions needed on south side of house.
Mr. Koontz called T&D and said that his wife was driving on the alleys at 420 E. Kirkwood (behind McDonalds's) and did a lot of damage to her car.
The sidewalks in front of 806 & 810 W. 4th Street are in very poor condition. They are crumbling and cracked. They are hazardous to walk across and need to be replaced.
Received email from Leland Rogers concerned about the timing of the Marilyn Drive Sidewalk Project.
It is Mike's understanding that Covenanter Dr. is not to be used as an access road for construction of condos south of Eton Mews. Mike saw two dump trucks go through this morning that he thinks belongs to Rogers Group.