Potholes, Other Street Repair
1501 S Highland AVE
- Case Date:
- 6/7/2021
The double-yellow line and left-turn lane (westbound) on Highland have become very difficult to see. It looks like maybe road oil or asphalt has darkened or faded them after the recent repaving of the road. I've seen on-coming traffic (east-bound) not see the left-turn lane on Hillside to Highland, and have to swerve out of the way as cars enter the left-turn lane to go to Highland. Repainting the lines would help a lot!
Potholes, Other Street Repair
- Case Date:
- 6/9/2021
Just checking in on closed case, thank you. Could sure use some asphalt thrown down if delay in paving Pickwick will be long.
#175370
Potholes, Other Street Repair:
Other: As rain come downhill on the street, it sometimes overwhelms our drainage tunnel. Over the years this created a line of crumble in Pickwick, in the last two years this has become a serious hazard for bicycles, pedestrians and not too good for our cars. Is there a chance we could get some blacktop put down on this? I'll be taking bids to resurface my driveway this summer, and it would be best if the street was repaired before this work gets done. Thank you! Jim Murray 1306 S Pickwick Pl Bloomington, IN 47401 812-339-8876 (home) 812-345-5513 (mobile) jmurray@iu.edu
Assigned to
Danna Workman
Attachments
See all thumbnails
4/8/2021
606f27210dde8 4/8/2021
Most tickets of this type should be closed within 7 days, although some cases may be longer. 0 days have already passed.
History
4/8/2021 13:48:09 Closed by Chris Axsom
Jim, thank you for your Ureport. Pickwick is on the schedule to be repaving tentatively in May.
Sent notification to Danna Workman, Anonymous
4/8/2021 12:36:49 Danna Workman commented on this case.
Supervisor will check into your concern.
Sent notification to Danna Workman, Anonymous
4/8/2021 11:54:08 Anonymous assigned this case to Danna Workman
Sent notification to Danna Workman, Anonymous
4/8/2021 11:54:08 Opened by Anonymous
1306 S Pickwick PL