Potholes, Other Street Repair
614 W Allen ST
- Case Date:
- 6/2/2025
A couple small potholes on W. Allen St. just east of the intersection with Fairview. This whole intersection should be carefully checked since there will be an art installation going in on June 14 via ESD. Thanks.
Potholes, Other Street Repair
2006 S Bernard DR
- Case Date:
- 6/2/2025
Hello - I am the manager of the Osage Place Homeowner Association. The Board of the Osage Place neighborhood is wondering if it is possible to stripe parking spaces on Bernard Street. The goal is to help identify parking spaces and alleviate those parking improperly and leaving large distances (but not enough to park) when parking on the street. The homes on the west side of Bernard do not have off-street parking, so they must utilize the on street spaces. Thank you, Suzanne OConnell (Focus Property Mgt) 812.200.6128 Tel
Potholes, Other Street Repair
1000 W Allen ST
- Case Date:
- 6/2/2025
Pothole on W. Allen St. just east of the intersection with Strong Dr.
Potholes, Other Street Repair
900 W Allen ST
- Case Date:
- 6/3/2025
Heading west on W. Allen Street before the light on Patterson Drive, there is a very deep pothole. Most of W. Allen Street needs repaved if possible.
Potholes, Other Street Repair
900 W Allen ST
- Case Date:
- 6/3/2025
There is large pothole on eastbound Allen West of the stoplight at Patterson
Potholes, Other Street Repair
347 1/2 S Davisson ST
- Case Date:
- 6/4/2025
West Smith Avenue, between Buckner and Davidson is eroding. There's trenches on either side. The storm drain at the corner where the stop sign is is sinking at least 3 feet down, it gets filled with debris, there's dirt and everything pouring into it, so it floods. Drivers are cutting corners on both sides, both sides of Smith. If you're traveling west, or if you're turning right onto West Smith, they're cutting a corner, driving over dirt in the yard, and that's contributing to more debris.
Please consider this road for resurfacing.
Potholes, Other Street Repair
1347 E Bradshire ST
- Case Date:
- 6/6/2025
E. Bradshire St. the first street with houses built in the Sherwood Oaks neighborhood has not ever been repaved while the newer leader built sections of the subdivision have been repaved on a regular basis. At what point are we going to repave the crumbling E. Bradshire St. when every winter huge chunks of pavement come up with the snow plows.
Potholes, Other Street Repair
1119 S Henderson ST
- Case Date:
- 6/6/2025
Deepening pothole in northbound lane kind lane of Henderson, just north of the Grimes intersection
Potholes, Other Street Repair
900 W Allen ST
- Case Date:
- 6/7/2025
There is a very large pot hole on this street. Huge chunks of rock are falling out of it and can damage cars. The pot hole is about 2 ft long. W Allen street also has additional pot holes going up the hill.
Potholes, Other Street Repair
2799 E Crabapple CIR
- Case Date:
- 6/8/2025
Potholes throughout the neighborhood from the winter plowing.