closed #201942
Unsafe Buildings
500 S Park Ridge RD
- Case Date:
- 4/8/2025
Open utilities box north side of building 9. Flood water caused it to come open.
Open utilities box north side of building 9. Flood water caused it to come open.
Broken drain still not fixed. Risk of small animals or people legs to fall into. Maintenance has been aware of it for several months with no fix.
I just watched the inspector look at this and reported that it was closed however it is still clearly open and a hazard. North side of building 9
Broken landscaping light across from the bus stop.
No attempt to fix the exposed romex around all the building.
How is this both safe, and not a hazard. The far back building behind office near spillway. Update 5/7/2025… The meters are unattached from the building as of right now. Duke is planning on coming out next week to reattach to the building. Maintenance personnel is going to contact me once it is reattached
Broken outlet meant to building 16 along with several outlets with exposed wires
They have been doing lots of major renovations and construction on the building and haven’t pulled any city permits.
Electrical cable just dangling from the outside of building
Meter box falling off the wall of building 4