closed #193872
Street Trees
719 N Grant ST
- Case Date:
- 10/1/2024
Area where tree was removed is a mess now, either fix it up with grass or another tree needs to be planted. Thankyou
Area where tree was removed is a mess now, either fix it up with grass or another tree needs to be planted. Thankyou
Street needs cleaned around this street and corner.
CVS has installed super bright new lights. We think they are breaking the city code that limits foot candles projected onto a neighbors property. We are immediately beside them and their lights are lighting up our yard and house. I have included an image from the middle of my back yard with only one of their new lights on. They are installing a dozen others along our property, 8 in goose necks, 2 others on the side of the building and 2 other pole lights! We are going to be lit up to the point where we won't be able to sleep at night. Can the city do something about this?
Please tag the "Calls for Service" data in the Open Data Portal with "911" and "Dispatch". Thanks!
There are large potholes on kinser pike between the bypass and winding way. Is there my car out of alignment.
Tree/bush is blocking the sidewalk, have to duck or walk off sidewalk. Needs trimmed
Tree/bush is blocking the sidewalk, have to duck or walk off sidewalk. Needs trimmed
They have not mowed their yard in 2 months. It's nothing, but weeds. On our lease it says we must mow once a week. They have junk laying around. I have contacted management & they do nothing.
Violation of city code. This property is absolutely maxed out on % of impermeable surface, and yet they have another paving project. There are already flooding problems during heavy rains at this location, in the streets and surrounding properties. Please enforce this. The city and neighborhood cannot handle the amount of runoff from this property as it is. This needs to be enforced.
Why was feedback on the mural at 11th & rogers only asked for with simply one design submitted? And to that point, why was feedback submitted not taken? Public sees absolutely no changes to the proposed design and leaves us feeling the same way when the gateway was decided unilaterally at miller park. At least in that instance council stepped in to halt the design. Is the artwork at hopewell going to be treated the same way? Public feedback submitted but has no impact on actual result for our neighborhoods and city? Disappointing.