uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (122224)

closed #206061

City Construction Projects

Case Date:
10/1/2025

The current construction project on 2nd street is extremely disruptive and causes the building to shake. For necessary/emergency daytime construction this is totally understandable, but the project on 2nd st (between Walnut/Rogers) has been doing construction only from late evening to overnight around 4-5am every day. I have not slept since the construction started a week ago and it is scheduled to continue another full week. Even if there is a permit to be exempt from the noise ordinance, please consider rescheduling this work to take place during daytime hours. As I said, the deeper digging affects the foundation of the building, causing very irritating vibrations that give me headaches and make sleep impossible. It has affected my work life and mental health to miss so much sleep. My window faces the road and this has been an absolute nightmare of a time for me.

closed #205289

Trash

Case Date:
8/26/2025

On 8/25/25 the trash can at the bus stop just south of BJ Brewhouse, 411 S College Mall Rd was overflowing and litter on the ground - total eyesore.

open #206096

Potholes, Other Street Repair

Case Date:
10/2/2025

potholes on 17th ,south side of street, between stadium gate 6 and woodlawn

open #206112

Traffic Related Complaints

Case Date:
10/3/2025

intersection at Sare and Rhorer. If turning left onto Rhorer it's very difficult if not impossible to see around the car to your right that's turning onto Rhorer. Also, cars coming down the hill on Rhorar, to the left are very fast. Should be 4-way stop or traffic light.