uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (120409)

closed #188429

Debris Removal (Sand, General Street Debris)

1199 S College Mall RD

Case Date:
5/14/2024

on college mall road in front of five gys resturant, when who ever mows there always leaves the grass in the road along college mall road. it clogs up the sewer drains there . it tends to flood the sometimes.

closed #169507

Other

1199 S Weatherstone LN

Case Date:
7/22/2019

On the bike path from Weatherstone to Davis, there is poison ivy growing across the path near the top of the steep part on the right side as you are going up the hill. This path needs to be wide enough for two bikes to pass. That's an especially bad place for poison ivy because it's right where someone might give up making it all the way up and need to step off the bike.

closed #78713

Recycling

1199 S Weatherstone LN

Case Date:
8/9/2010

Resident said we missed at least 3 people in this block. I told him to leave out. Sent man out and recycle was not out.

closed #74953

Trash

11TH & N. FESS

Case Date:
2/23/2011

Caller states that trash complaint is on the SW corner of 11th & N. Fess, Gray house

closed #81609

Line of Sight

11TH AND OOLITIC

Case Date:
9/1/2009

Line of sight issue

closed #192271

Sidewalk & Curb Complaints

11th & Maple

Case Date:
7/17/2024

Core hole in crosswalk from fiber project is filled with loose gravel

closed #192374

Sidewalk & Curb Complaints

11th & Maple

Case Date:
7/22/2024

There is a hole filled with gravel (which is somewhat washed out) in the crosswalk at this location. Appears to he leftover from fiber project

closed #192435

Sidewalk & Curb Complaints

11th & Maple

Case Date:
7/24/2024

Third attempt in a week to get the gravel filled hole in the middle of the crosswalk repaired. Appears to be left over from city fiber project

closed #192529

Potholes, Other Street Repair

11th & Maple

Case Date:
7/29/2024

Hole left from fiber project in crosswalk

closed #192851

Potholes, Other Street Repair

11th & Maple

Case Date:
8/13/2024

Gravel filled hole in crosswalk from fiber project has persisted for over a month and through multiple uReports.