City Construction Projects
822 S Fess Ave
- Case Date:
- 11/6/2024
822 S Fess again. The gigabit people are at it again. End of driveway and into neighbor. Left a hole and trash, plastic debris and empty water bottle. Just abandoned with a hole by neighbors tree at end of drive way. Please get these people under control. So they have left this as if they started digging, changed their mind and left. Then they dug up my front yard and then on Monday, a water main rupture from their digging. ALL other installation has been down the alley WHERE the power lines run. Please respond. Issue #3.
City Construction Projects
512 E University ST
- Case Date:
- 12/27/2024
Not sure who to contact for fiber installation issues. The workers installed a plastic access pipe in people front yard in the corner of driveway and sidewalk. Inevitably, a large truck is going to drive over it and crush it, potentially damaging the fiber. They removed the tarp with dirt, so I a now assume they are done? Would like to see this access moved farther from
City Construction Projects
- Case Date:
- 2/5/2025
The boardwalk on the north side of E. 2nd between Anita and Rose is in need of repair. I would say that it's close to being dangerous.
City Construction Projects
220 N Morton ST
- Case Date:
- 12/16/2024
A manhole cover is off on highland by 3rd
City Construction Projects
- Case Date:
- 3/18/2025
Construction for hopewell neighborhood: driving west between rogers and walker. Today is the 3rd time there is a team working without a flagger directing traffic in the street. The work is being done with a bobcat of some kind blocking one lane immediately before a hill, where you cannot see oncoming traffic. I’ve called twice about this already. Thank you!
City Construction Projects
- Case Date:
- 3/24/2025
Debris from construction left on either side of 11th street and Indiana ave. Needs cleaned up
City Construction Projects
723 W Allen ST
- Case Date:
- 3/29/2025
Entire roof being removed in historic district - concerns it is not permitted work and concerns for spread of moldy / asbestos contaminated insulation being thrown
City Construction Projects
1120 W 2nd St
- Case Date:
- 4/9/2025
Why there road work at west 2nd street
City Construction Projects
320 N Jacob DR
- Case Date:
- 4/30/2025
Cut pavement hole by city 3 months ago and never blacktop. Hole is still there and very, very annoying!! I believe it’s a job unfinished or forgotten by city workers transportation department!
Thank you
City Construction Projects
- Case Date:
- 5/14/2024
Let you know your construction signs have fallen down they sign sitting on grass on liberty