City Construction Projects
5900 N MAPLE GROVE RD
- Case Date:
- 11/8/2001
Fax was received stating that Mike and Julie Donham were upset with the final yard work at 515 S. Washington St. in Bloomington, IN. They feel add'l. topsoil and seeding are needed along sidewalk and 2 depressesions needed on south side of house.
City Construction Projects
420 E Kirkwood AVE
- Case Date:
- 6/13/2000
Mr. Koontz called T&D and said that his wife was driving on the alleys at 420 E. Kirkwood (behind McDonalds's) and did a lot of damage to her car.
City Construction Projects
806 W 4th ST
- Case Date:
- 6/20/2011
The sidewalks in front of 806 & 810 W. 4th Street are in very poor condition. They are crumbling and cracked. They are hazardous to walk across and need to be replaced.
City Construction Projects
1924 E Marilyn DR
- Case Date:
- 4/5/2011
Received email from Leland Rogers concerned about the timing of the Marilyn Drive Sidewalk Project.
City Construction Projects
E COVENANTER DR
- Case Date:
- 10/9/1996
It is Mike's understanding that Covenanter Dr. is not to be used as an access road for construction of condos south of Eton Mews. Mike saw two dump trucks go through this morning that he thinks belongs to Rogers Group.
City Construction Projects
100 E 6th ST
- Case Date:
- 4/7/2000
due to the project at 7th and Walnut the lack of striping in the 100 Block of E. 6th is even more critical than before. Please ASAP stripe the angle parkinging in the 100 jBlock of E. 6th.
City Construction Projects
- Case Date:
- 6/7/2017
Hunter and Eastside
City Construction Projects
201-251 North Lincoln Street
- Case Date:
- 6/21/2017
Hi,
There's a couple of large road cuts at the intersection of Lincoln and 6th St. If the city is not planning on filling these any time soon could we at least get the sharp edges softened? Sometimes I've seen this done and it makes road cuts much easier to drive over without damaging your tires.
Thanks,
Vickie Nelson
Bloomington
City Construction Projects
4021 E Morningside DR
- Case Date:
- 7/25/2017
I just took possession of a home I bought as sidewalk construction on E. Morningside was being completed. The home is at 4021 E. Morningside. It is my understanding the City redid part of the driveway after having to destroy it for sidewalk work. Unfortunately it appears a corner of the drive (front right / SE) is already cracking/chipping/spalling (see photo). I'm requesting the City patch this up before it continues to flake (not huge now but would like addressed so as not to spread) as an area driven over frequently. Otherwise looks fantastic and very happy with the new sidewalk and drive portion. Great neighborhood addition.
City Construction Projects
1106-1112 South Graywell Drive
- Case Date:
- 8/16/2017
Does the city have a plan for taking in, and disposing of, our old trash bins and cans? Saying that "Residents are encouraged to reuse their old trash cans as yard waste containers" seems ingenuous. How long a yard waste season goes Bloomington have? -- 6 months? Where will I store 2 35-gal. cans and a 20-gal., plus the 3 bins currently used for recycling -- since my garage will be filled up with two 64-vallon containers?