City Construction Projects
3950 W Tapp RD
- Case Date:
- 1/21/1997
MS. BRIDGES CALLED TO COMPLAIN THAT WHEN NEW WATER LINE WAS PUT IN TAPP RD. WAS TORN UP AND WAS ONLY PATCHED, NOT REPAVED. SHE CALLED UTILITIES AND WAS INFORMED THAT ROAD WOULD BE REPAVED BY CONTRACTOR IN DECEMBER. ROAD HAS NOT BEEN REPAVED AS OF TODAY.
City Construction Projects
S ADAMS ST
- Case Date:
- 11/7/1996
STREET CAVING IN WHERE WORK WAS DONE
City Construction Projects
2425 N Headley RD
- Case Date:
- 8/15/1996
Citizen says there is a utility cut right where Headley road curves around in front of Headley School (where Matlock becomes Headley). Says its been there for about a month and needs to be filled in. Believes it was City Utilities working there but not sure.
City Construction Projects
101 S Smith RD
- Case Date:
- 5/28/1996
AT THE CORNER OF MORNINGSIDE DRIVE & SMITH ROAD. THE CITY FINISHED THEIR PROJECT OUT THERE ABOUT A YEAR AGO THERE IS A SMALL PLOT OF LAND AT THIS INTERSECTION THAT HAD SOD PUT DOWN. THE GRASS DIED AND MR. BROTHERS WOULD LIKE FOR THE CITY TO REPLACE THIS PORTION. THIS AREA IS IN THE CITY RIGHT OF WAY. JANE FLEIG DID GO OUT TO TAKE A LOOK AT SITE ON 5/28/96.
City Construction Projects
1210 W 8th ST
- Case Date:
- 12/14/1995
Street Dept. is installing a handicap ramp in front of his property. He says that the property is not handicap accessible and that there shouldn't be a ramp there. Sidewalk crews told him that they are required to put in ramps per ADA.
City Construction Projects
2215 W 3RD ST
- Case Date:
- 6/16/2004
Mr. Potter expressed disapproval and a desire for the West Third Street Phase II project to utilize two way left turn lanes instead of a raised median.
City Construction Projects
1116 S College Mall RD
- Case Date:
- 1/8/2004
Deb McMullen is upset that the city has spent all this money on the College Mall Road project, and the best the city could come up with was restricting only one business, namely Dr. Steeles, to no entry from the south. She says that it looks bad on the department.
City Construction Projects
1116 S College Mall RD
- Case Date:
- 10/20/2003
Desires a cleanout for the slotted drain in the driveway.
Desires a tree well for the gum tree on north side of drive.
Desires drainage improvements on the southeast side.
Desires opening in the median.
City Construction Projects
1103 N Woodburn AVE
- Case Date:
- 1/22/2003
Letter stated Mr. Schatz feels that a crack (leak) in his pvc pipe connector to meter was caused by damage during construction. Customer had break repaired but received extra large water bill. Wants matter investigated and adjustment made.
City Construction Projects
4037 W STATE ROAD 45
- Case Date:
- 6/19/2003