uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (120364)

closed #127159

Trash

301 E Kenler DR

Case Date:
7/10/2012

closed #127160

Trash

825 W Cascade AVE

Case Date:
7/10/2012

Handle on can broke due to it being overweight, which crew did not know until attempting to pick it up.

closed #127161

Trash

1600 N Willis DR LOT 110

Case Date:
7/10/2012

Several bags/cans of trash out, none with stickers.

closed #127162

Other

Case Date:
7/10/2012

Karen Knight has called in and asked for the stickers to be removed from the speed bump signs on West 3rd Street from Jackson to Walker

closed #127163

Recycling

1612 E Matlock RD

Case Date:
7/10/2012

closed #127164

Graffiti

Case Date:
7/10/2012

808 s. washington electrical panel has black and blue graffiti

closed #127165

Graffiti

Case Date:
7/10/2012

923 s. walnut bob jones radiator repair shop has graffiti on building facing alley

closed #127166

Graffiti

Case Date:
7/10/2012

One of the signs on the chicanes on Third Street between Buckner and Davisson has graffiti and stickers on it. The cement pole on the chicane at Davisson and Third has been knocked down.

closed #127167

Other

Case Date:
7/10/2012

I just found all the calendar feeds on the site. WIN! A very cool thing because now I don't have to enter all that stuff into my calendar, I can just subscribe. Thanks!

closed #127168

Traffic Related Complaints

2548 E Eastgate LN

Case Date:
7/10/2012

The construction plan and closures are ridiculous. We get no notice of any road closures and we now have one way in and out of our apartment complex, which leads to a congested one lane road. We received no notice of any road closures which included our side of 45/46 and Pete Ellis. How am I supposed to get to work on time when you change the roads and lights during rush hour traffic which causes major traffic jams. The overall thought and planning put into all road construction in Bloomington is abysmal. If giving notice of road closures is too difficult to do then try to focus on completing the construction on one road before starting construction on another.