uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (3060)

closed #199694

City Construction Projects

2801 E David DR

Case Date:
12/17/2024

Metal sign near David & Sare leftover from project near Hyde park

closed #199237

City Construction Projects

822 S Fess Ave

Case Date:
11/6/2024

822 S Fess again. The gigabit people are at it again. End of driveway and into neighbor. Left a hole and trash, plastic debris and empty water bottle. Just abandoned with a hole by neighbors tree at end of drive way. Please get these people under control. So they have left this as if they started digging, changed their mind and left. Then they dug up my front yard and then on Monday, a water main rupture from their digging. ALL other installation has been down the alley WHERE the power lines run. Please respond. Issue #3.

closed #199774

City Construction Projects

512 E University ST

Case Date:
12/27/2024

Not sure who to contact for fiber installation issues. The workers installed a plastic access pipe in people front yard in the corner of driveway and sidewalk. Inevitably, a large truck is going to drive over it and crush it, potentially damaging the fiber. They removed the tarp with dirt, so I a now assume they are done? Would like to see this access moved farther from

closed #201608

City Construction Projects

Case Date:
3/18/2025

Construction for hopewell neighborhood: driving west between rogers and walker. Today is the 3rd time there is a team working without a flagger directing traffic in the street. The work is being done with a bobcat of some kind blocking one lane immediately before a hill, where you cannot see oncoming traffic. I’ve called twice about this already. Thank you!

closed #201692

City Construction Projects

Case Date:
3/24/2025

Debris from construction left on either side of 11th street and Indiana ave. Needs cleaned up

closed #201967

City Construction Projects

1120 W 2nd St

Case Date:
4/9/2025

Why there road work at west 2nd street

closed #202397

City Construction Projects

320 N Jacob DR

Case Date:
4/30/2025

Cut pavement hole by city 3 months ago and never blacktop. Hole is still there and very, very annoying!! I believe it’s a job unfinished or forgotten by city workers transportation department! Thank you

open #202435

City Construction Projects

Case Date:
5/2/2025

Construction equipment is parked on the sidewalk. The city would not let businesses park this equipment on the street, blocking access for cars. Why do you allow them to block access for pedestrians? Thank you. West 2nd street just east of eucild street northwest of street

closed #161401

City Performance

Case Date:
10/3/2017

a few weeks ago i wrote on ureport about the missing crosswalk button device at the intersection of west 3rd street & franklin. later when i looked at ureport again i could see that a city engineer had contacted the i-69 project to tell them it was their problem. it still didn't get fixed, so i called the phone # for 1-69 & left a voice message. a man from there called me back & said that their project doesn't go that far, so it's up to the city to fix that. his name is kirk roth so if there is still a dispute, please call him at the phone# on their website. this needs to get resolved please for pedestrian safety at a very busy intersection. people who live on yancy etc need to cross there to get to the bus-stop across the street to go to work. thanks

closed #161818

City Performance

Case Date:
11/14/2017

What used to be a 10 minute drive to work now takes close to 35. Why? Construction on Tapp, 37, Rodgers, Walnut, 10th Street, Dunn, Fee, and Gordon Pike closed. There is literally not any route left to get to work. Everyone on the south side is forced to sit in traffic for two to three times the normal length due to terrible planning by the city in the closing of streets and construction that has effectivity shut down part of the city and prevent us from going anywhere or doing anything.