Utility Construction Projects
615 N Washington ST
- Case Date:
- 11/10/2024
Fiber co. Cut sidewalk. Someone came to patch with asphalt. Asphalt sunk immediately. Looks like a significant hole in sidewalk. Water meter appears to be affected as well - tilting towards the hole (did not use to).
Blocked Street
301 E 19th ST
- Case Date:
- 1/28/2025
Cara parked on both sides of the street, where construction work is about to begin, this is a hazard for both pedestrian and vehicles going down through this street. Larger trucks will not be able to move through
- Case Date:
- 2/3/2025
Hello ,
During the month of December 2024, there was utility work done on my property while I was away for the winter break. When I returned, there was 1.5 feet of snow; however, since it has melted, I have seen the damage that was done to my front yard - see the attached photos. There are two holes in my lawn (photo on right) and the crew stained my limestone walkway (photo on left). Can you please send the utility company to repair these damages as soon as possible?
Thank you.
Sincerely,
Elida C. Behar
February 3, 2025
Utilities Yardwork
900 E 1st ST
- Case Date:
- 2/4/2025
Should this be corrected to avoid falls or other problems?
Blocked Sidewalk
https://www.google.com/maps?ll=39.169927,-86.536806&z=14&t=m&hl=en-US&gl=US&mapclient=apiv3&cid=6740777513345392512
- Case Date:
- 2/8/2025
Questions and answers
...
What's the phone number? Why isn't it listed?
Answer this question
...
Rocknroll Hayes
Local Guide · 99 reviews · 1 photo
6 days ago
New
...
I have been a patient at the Eye Center since 2016. It started with double vision, soon found I had glaucoma, They have been kind, caring, and thorough. Just days ago, I underwent cataract surgery. Once again, they were very thorough. I … More
Like
...
Share
...
Darla Wilson
8 reviews
3 months ago
...
Every one was very polite and knowledgeable, explained the testing and the surgery scheduler was awesome and made sure I understood the process, Dr Gray was very polite and knowledgeable and explained things answered all my questions. The … More
Like
...
Share
...
Connie Parker
4 reviews
...
4 months ago
...
I was very anxious about my Cataract surgery. I am very claustrophobic and just the thought of a drape over my face almost had me canceling my procedure. My fears were totally unfounded. The entire surgery team made me feel so secure. … More
...
1
...
Share
...
Blocked Sidewalk
1st street between Morton and College
- Case Date:
- 2/10/2025
There is a section of fencing flat on the sidewalk behind Kroger Seminary Square, leaving little room for pedestrians and blocking wheelchair access entirely.
- Case Date:
- 2/10/2025
In October, when fiber optic line was being laid in our neighborhood, the installers inadvertently ran it through our sewer line. A few days later, the breached line backed sewage into our house. We hired plumbers to snake and inspect the line and we were able to see the blockage was caused by the fiber optic line. The fiber optic installers created a patch around our sewer line, but we were stuck with a $700+ plumbing bill. We feel that the fiber optic line installers should reimburse us for the plumbing bill, but can’t connect with anyone. A guy named Mike Nally, who seemed to be a supervisor, took our info and pics of the problem and promised to pass them on, but we’ve never heard from anyone. Can you connect us to someone who can arrange for us to be reimbursed? I have tried to attach a photo of the bill as well as of the camera shots of the blocked sewer line.
Blocked Sidewalk
212 W 4th ST
- Case Date:
- 2/10/2025
On the sidewalk at 212 W 4th St, north side of street, there is a pile of orange plastic barriers that are left over from the street replacing project that was completed in late 2024. The pile is blocking half of the sidewalk. Please remove. Thank you! Charles Russo
Potholes, Other Street Repair
231 S Rose Ave
- Case Date:
- 2/13/2025
Part tectonic plate, part aircraft carrier bulkhead--Houston, we have a problem.
It would seem that some utility repair of another has resulted in a steel plate the thickness of a very hefty mozzarella stick, length and width that could probably park a Smart Car, in the middle of the road. I suspect this formidable obstacle is the result of whatever adventure IU tasked itself with over winter break, as I observed their vehicles there, but that's not to say I'm 100% positive. Either way, the impact of this scrapper's dream was presumably originally mitigated with the pouring of some cold patch concrete around the edges, but alas, much has changed since. Tire impact after tire impact has slowly moved this plate, rendering the cold patch mostly useless. As steam billows out from around the edges, I imagine whatever was being fixed is still in the process of being fixed. But at the moment, it's like witnessing suspension-damaging continental drift. Aside from mounting this hulking piece of metal in a museum as a replicated piece of the Titanic's hull, creating a more subtle transition from pavement to metal would very much be appreciated.
Thank you and have a wonderful day.
Blocked Street
West 3rd Street
- Case Date:
- 2/13/2025
When traveling west to east on West 3rd Street, a recent installation has blocked the entrance to Arby's.