closed #128329

City Construction Projects

100-198 E Smith Ave

Case Date:
8/31/2012

It is not as safe as it should be to drop off and pickup students at the project school. The construction and parent traffic is directed to the alley between walnut street and Washington street. Often this vehicle traffic fails to yield to pedestrians making walking with children very worrisome.

closed #179296

Blocked Sidewalk

100 W 6th St, Bloomington, IN 47404, USA

Case Date:
3/21/2022

Samira stores the outdoor furniture in front in on the sidewalk.

closed #177521

Biking & Walking

100 N Walnut St, Bloomington, IN 47404, USA

Case Date:
9/20/2021

cars are treating the two lanes both as eastbound through lanes making it an interesting conflict with bikes. signs on the pavement still indicate through or turn.

closed #174620

Trash

10 S Rockport Rd, Bloomington, IN 47403, USA

Case Date:
2/2/2021

It seems like people are dumping trash along the B-Line Trail. I feel that a lack of trash cans may be to blame. Could more trash cans be added along the trail to help prevent this problem?

closed #170485

Traffic Signals

1-55 E Winslow Rd, Bloomington, Indiana, 47401

Case Date:
9/24/2019

Since construction started on Winslow Rd. between Walnut St. Pike and S. Walnut St., westbound traffic on Winslow has been a mess due to the single westbound lane approaching the intersection with S. Walnut St. If there is a mix of cars going straight and cars turning left in the single westbound lane, only 2-3 cars make it through on each cycle of the traffic light. During this construction, westbound Winslow Rd. at Walnut St. should either be made "no left turn" or the traffic light cycle should be changed so that westbound traffic gets a period of simultaneous green light and green left turn arrow to allow traffic to clear.

closed #193636

Traffic Suggestions

1 W Tapp Rd

Case Date:
9/19/2024

Dedicated left turn lane for people traveling east on Tapp and turning towards BUGS and Woolery Mill.

closed #177000

Traffic Related Complaints

021C, Bloomington, IN 47408, USA

Case Date:
8/15/2021

Temporary lane markings were left after construction of 7th street bike lane, but they appear to be incomprehensible to majority of traffic and are also peeling off of pavement. Westbound cars regularly drive in the left-side, oncoming lane, or directly in middle of both lanes. Either method is a hazard to eastbound traffic as well as westbound traffic turning left onto Dunn as cars in left lane will try to go straight past turning traffic. Temporary directional arrows were installed but seem to have made no improvement. Disaster waiting to happen.

closed #202315

Street & Traffic Signs

015F

Case Date:
4/27/2025

"Rough road" construction sign remains weeks after project complete. SW corner Fess/11th.

closed #202090

Blocked Sidewalk

015A

Case Date:
4/15/2025

The parking lot is corroding, creating a mess all over the public walk way. Needs to be cleaned up asap

closed #173466

Trash

015-32590-00, Bloomington, IN 47403, USA

Case Date:
8/24/2020

Excessive garbage (couch, trash can, fast food particles, clothing, paper, abandoned truck and misc. furniture) in the parking lot between the two warehouses ....been like for weeks...maybe a great option for community service for students ???