Blocked Sidewalk:
# 182909 Blocked Sidewalk FROM ONE MONTH AGO NO RESPONSE!!!!
Assigned to
Michael Stewart
MICHAEL STEWART HASN'T RESPONDED TO CASES FOR TWO MONTHS. I have identified a hazard and the city is doing NOTHING about it. Why have this reporting system if our citizen complaints aren’t being answered?
- Case Date:
- 2/27/2024
Can someone provide an update on the Morningside Greenway installation? We're excited and believe it was intended for spring, but didn't know if a more solid date is now chosen. Workers were walking the street the other day looking at trees.
City Performance
2057 E Cheyanne LN
- Case Date:
- 8/6/2024
Hi there,
I wasn't sure what section to file this complaint under, since it is related to a loud construction project that has been ongoing on High street for several weeks. There was no major issue up until today, August 6. It is now almost 10:30 PM and the construction has not finished for the night. There is a loud machine (a pump, maybe?) that has continually run since about 8:30 pm and is showing no sign of stopping. We have small kids who are sensitive to noise, and we live right next to the construction. I understand the workers have to complete their task, but to go this late at night seems disruptive to folks in the area.
Thanks.
City Performance
2001 E Viva DR
- Case Date:
- 1/13/2025
The crews that installed the digital fiber in front of my house cut down some small trees, but didn't haul away the branches. The chipper truck came through and picked up tree debris from other yards, but not from mine. Can it still be picked up?
City Performance
417 N Elm St
- Case Date:
- 3/3/2025
The fiber crews were on our street and parked heavy machinery in my parking lot, they punctured a hole in my asphalt and scratched the concrete of my green space.
City Performance
700 S Eastside Drive
- Case Date:
- 4/9/2025
The fiber optic cable pit at 700 S Eastside Drive (right next to the No Parking Any time sign) is missing its (green?) cover, so now there is a big hole in the grass.
I think it was blown off by a recent storm.
City Construction Projects
100-198 E Smith Ave
- Case Date:
- 8/31/2012
It is not as safe as it should be to drop off and pickup students at the project school. The construction and parent traffic is directed to the alley between walnut street and Washington street. Often this vehicle traffic fails to yield to pedestrians making walking with children very worrisome.
City Construction Projects
500-520 S Walnut St
- Case Date:
- 4/18/2012
Regarding construction on South Walnut Street- at the intersection with second street, motorists are trying to go north from both lanes south of second into the single lane north of second street. These lanes need to be clearly marked during construction as typically the far left lane is for left turns only. Please make it easier for people to know where to go. Thanks.
City Construction Projects
201-251 North Lincoln Street
- Case Date:
- 6/21/2017
Hi,
There's a couple of large road cuts at the intersection of Lincoln and 6th St. If the city is not planning on filling these any time soon could we at least get the sharp edges softened? Sometimes I've seen this done and it makes road cuts much easier to drive over without damaging your tires.
Thanks,
Vickie Nelson
Bloomington
City Construction Projects
4021 E Morningside DR
- Case Date:
- 7/25/2017
I just took possession of a home I bought as sidewalk construction on E. Morningside was being completed. The home is at 4021 E. Morningside. It is my understanding the City redid part of the driveway after having to destroy it for sidewalk work. Unfortunately it appears a corner of the drive (front right / SE) is already cracking/chipping/spalling (see photo). I'm requesting the City patch this up before it continues to flake (not huge now but would like addressed so as not to spread) as an area driven over frequently. Otherwise looks fantastic and very happy with the new sidewalk and drive portion. Great neighborhood addition.