uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (3067)

closed #165877

Traffic Suggestions

2990 E Covenanter DR

Case Date:
9/11/2018

I am requesting speed bumps for Covenanter Drive, between College Mall Road and Clarizz Blvd. This is residential area with two large apartment complexes. It's also a heavily traveled road for buses, bikes and vehicles, as well, as pedestrians. Many use it as a way to cut through the area or to reach nearby apartment complexes, the mall, the large Kroger, or medical offices. Speeding is a concern. Line of sight can also be issue with two bus stops, curbside parking, the road's curve and change in elevation. I think speed bumps would help the issue, just like it has done on Covenanter Drive, going west from College Mall to High Street.

closed #176782

Blocked Sidewalk

2983 N Ramble RD W

Case Date:
7/30/2021

Bushes block sidewalk, have to walk in the street.

closed #193821

Traffic Suggestions

2950 N Prow RD

Case Date:
9/30/2024

Hello, I just wanted to suggest installing traffic lights or adding round abouts at the entrances/exits at Bloomington North. The area is extremely busy around 7:30am and 2:45pm with inexperienced drivers. It’s very difficult to get out of the school. The other area is N. Prow Rd turning onto Arlington. It’s actually pretty unbelievable that there are no lights or added safety precautions for students driving this route daily.

closed #147426

Traffic Related Complaints

2942 S Walnut ST

Case Date:
8/18/2015

Hello, I am re-developing the property @ 3000 South Walnut. The location is where the former Southern Winds Hotel and Roosters club were located. The property at the beginning a workout facility and a chiropractors office. AS you pull out from the property and are going to turn left (North) and cross traffic, there are two trees located to the north on the side of the road. When cars are coming South and I am turning to the North, it is difficult to see whats coming and that is where the speed limit changes from 30 to 40mph, which is the place many seems to start speeding up. We will have more traffic than ever entering and leaving the property right from the beginning and even more as the property continues to be redeveloped overtime after the initial building and business's are active. A stop light right around there of course would be superb for the property but probably could never happen due to the traffic that occur that comes over the hill when people are traveling South down South Walnut. With that in mind I was hoping the two large trees could be taken down so it is much safer at that point because of the visibility that would open up. One tree is directly in from of the property and the other is directly in front on an older apartment complex that has around 10 apartments in it, it looks like. Would this be possible? Or maybe we could plant a couple new tress which would be much smaller and take several years to grow out? Of course that problem would show up again several years from now but it would take care of it presently for sevevral years. I am just worried about such a great new area being redeveloped for the area and future to have potential traffic issues with people being able to see when pulling out of the property. Thanks a lot, Tommy.

closed #201500

Utility Construction Projects

2919 N Bankers DR

Case Date:
3/13/2025

Duke Energy has refused to remove a large orange cable that is down on the length of my property (3/4 of an acre). They say someone else needs to take care of it, like maybe a cable company. I am concerned that it is dangerous to kids in my neighborhood and I cannot do yard work around it. Moreover, it is in the utility easement. They said to pick it up and see if it is attached to the utility line and I am unwilling to do that because it seems risky. In any case, no utility should be leaving their waste on my property and they should take responsibility for removing it safely.

closed #176746

Street & Traffic Signs

2909 S Sare RD

Case Date:
7/28/2021

There was construction on Sare Rd. a while ago and there is still a sign posted on our rd. There is no longer any construction so we are hoping the sign can be removed.

closed #166580

City Construction Projects

2907 S McIntyre Dr, Bloomington, Indiana, 47403

Case Date:
11/19/2018

New Island in the middle of Tapp road just east of Kegg is not marked with any traffic cones or signs, hazardous, difficult to see

closed #161551

Traffic Related Complaints

2901-2979 South Rockport Road

Case Date:
10/13/2017

With the closure of Tapp Road intersection due to I-69 construction, a lot of traffic has been diverted on to the Tapp and Rockport Road intersection. Due to this there is a severe need for a traffic light at this intersection since now in the morning rush hour there is a long traffic backup on Rockport road towards coming into the city at the Tapp intersection. It would help if there was a four way traffic light added on this street so that it would help with the traffic pattern. -Concerned Citizen

closed #193742

Biking & Walking

2901 E 3rd ST

Case Date:
9/25/2024

Construction site at 3rd street and Pete Ellis has setup their construction fencing in the bike line along Pete Ellis. Was this intended and permitted?

closed #152628

Traffic Related Complaints

2900 North Walnut Street

Case Date:
5/2/2016

It is increasingly difficult to exit the Blue Ridge neighborhood at the main entrance/exit at North Walnut. Traffic has increased and is going at a dangerous speed on North Walnut.