Potholes, Other Street Repair
W 11th St
- Case Date:
- 7/9/2024
The city’s fiber project made a bunch of small holes in W 11th ST and filled them in with small river rick. As expected, they are washing out in the rain and leaving deep holes. Please repair!
Potholes, Other Street Repair
W 11th St
- Case Date:
- 7/10/2024
I submitted a report a day ago reporting that the City’s fiber project filled holes in the road with stones that were washing out. Surprise, with the rain yesterday they are even worse!
Potholes, Other Street Repair
11th & Maple
- Case Date:
- 7/29/2024
Hole left from fiber project in crosswalk
Potholes, Other Street Repair
1207 E Skylark CT
- Case Date:
- 8/1/2024
The cable pullers installing the fiber optics network on our court left a hole in front of my house that's huge and growing. It's nearly a yard long, over a foot wide, and at least nine inches deep. Please repair it.
Potholes, Other Street Repair
1410 E Hunter AVE
- Case Date:
- 8/9/2024
Hoping to have a street sweeper come for the dried dirt/muddy mess that was left from fiber optic internet installation on this portion of Hunter. Quite a mess. Not sure it will be taken care of by rain as it is thick in parts.
Potholes, Other Street Repair
1401 S Dunn ST
- Case Date:
- 8/9/2024
The people working on the fiber optic internet line left this hole in the road. There are lots of people who walk their dogs or bike in the dark, and I am worried that a dog will fall in it or it will cause injury to fellow citizens.
Potholes, Other Street Repair
- Case Date:
- 8/12/2024
It would be nice if there was a 'Utility Cut' sign on E First Street, warning motorists for the one cut at 1113 E First and the other one near the intersection of First and Ballantine. Unless you plan to pave them today.
Potholes, Other Street Repair
11th & Maple
- Case Date:
- 8/13/2024
Gravel filled hole in crosswalk from fiber project has persisted for over a month and through multiple uReports.
Potholes, Other Street Repair
525 E Grimes LN
- Case Date:
- 8/21/2024
Some utility company cut a hole in the asphalt here and then did an abysmal job of filling it in
Potholes, Other Street Repair
- Case Date:
- 8/21/2024
About ticket #192627. You closed it with the comment that the contractor has filled the hole. The contractor has half-filled it with gravel that is quickly being scattered as folks park with a wheel in the hole. The hole is growing, and is a hazard. It hasn't been filled.
Thank you,