Sewer Problems (Storm Sewers)
2315 E Queens WAY
- Case Date:
- 6/29/2022
This intersection drainage project has been weeks ongoing. Now we are left with an absolutely horrid street. The utility cuts were filled with gravel but have rutted out to be almost impassable. This is addition to the pot holes and drains that are unfinished.
Sewer Problems (Storm Sewers)
- Case Date:
- 6/22/2022
A couple of months ago the city started installing new stormwater pipes on E Saratoga Dr. The project appears to have been abandoned mid-way through. One side of the street remains dug up and very loosely covered with gravel. Construction equipment has never been moved. Is there a timeline for finishing the project and restoring the road?
Sewer Problems (Storm Sewers)
3100 S Coppertree DR
- Case Date:
- 6/14/2022
The street drain on the west side of the street is full of debris which inhibits drainage
Drainage or Runoff
1406 S Nancy ST
- Case Date:
- 6/8/2022
The drainage between 1406 and 1404 S. Nancy is extremely backed up with debris
Debris Removal (Sand, General Street Debris)
- Case Date:
- 6/8/2022
Two storm drain grates covered in debris. One along street at 114 E. 19th(recently reworked - buried with dirt and lots of debris AGAIN) and at 19th & N Wash covered in debris. These grates need to be on a hot list to check before and after heavy rains. Thank you. This has been a long time ongoing problem. Mitzy Lewis
Sewer Problems (Storm Sewers)
1400 - 1800 W 17th St, Bloomington, IN 47404, USA
- Case Date:
- 6/7/2022
Sidewalks, drainage grates and side-paths are covered in leaves, twigs, tree debris, limbs, rocks. Some drainage grates are almost completely blocked with debris. This problem is from the roundabout West to the fly-over to Vernal Pike.
Sewer Problems (Storm Sewers)
1904 S Montclair AVE
- Case Date:
- 6/7/2022
Road construction has Queens Way blocked. Construction was on the website earlier but has been removed. Construction is definitely NOT COMPLETED. Please update website with construction and new completion date.
Potholes, Other Street Repair
3424 S Cedarwood CIR
- Case Date:
- 6/4/2022
In the 3400 block of S. Cedarwood Circle, the City dug up the road a few months ago, then never came back to finish the job. The road is a mess with missing asphalt and gravel/debris all around. Can the City get back out here this week to fix this and finish up the work they started? Thanks.
Potholes, Other Street Repair
625 W 7th ST
- Case Date:
- 5/5/2022
Large hole in street that takes up most of the westbound lane ever since water main repair on March 23. It was filled with rock but is getting worse each day.
Sewer Problems (Sanitary Sewers)
2203 E Moores PIKE
- Case Date:
- 4/3/2022
The sewer lines for 2201, 2203, and 2207 connect together and then jointly connect to city sewer. As this was done sometime in the 1950s, is this up to current city codes? Over the past few years there have been a few sewer back-ups as a result of all lines being connected. Is there a grant available to the homeowners that will allow each of them to disconnect from each other and connect to city sewer individually? Please contact Nancy Goswami 812-679-0131 (2203), Kevin McWhirter 812-322-3553 (2201). Contact information for other homeowner is unknown to me.