closed #203056
Utility Construction Projects
620 W Howe ST
- Case Date:
- 5/30/2025
Black cord dangling from tree, looks electrical. Seems to have open cut ends. Unsure if they’re live, I didn’t try to test it.
Black cord dangling from tree, looks electrical. Seems to have open cut ends. Unsure if they’re live, I didn’t try to test it.
Oak tree between east sidewalk and street. Black cord hanging from tree, seems electrical. Appears to have cut ends on the ground. I didn’t attempt to see if they’re live.
Fienhydrant usage without back flow protection and meter. Spicewood addition. Contractor is Snedegar working with Duke Energy. 10/5/22 at 7 pm
Dana Leann Mobley called questioning why she is being billed for wastewater. Claims she is on septic. However, upon review of CUBS acct, it appears that she was part of the SR 48 project and the State paid her connection fees. Nancy has previous knowledge of this acct. Please review and contact customer back at 336-1095. Her address is 5414 W SR 48. System couldn't find the address.
When i bought this house 4 years ago, all paperwork said "city sewer" Turns out, my house actually runs on a Septic tank. Was not informed about this till one of your guys had to come over cause my water was backing up through the drains
Received notification that water pressure would be reduced on Friday, 11/2, 10a-2p due to intersection work at E Rhorer/S Walnut Pike. Water pressure is worse today (Saturday 11/3) and no one is working at the intersection.
Extremely low water pressure in my home.
Water pressure is very low
We have very little water pressure on the South Side (Clear View Drive). Are you aware of a water main break issue in the area?
Should this not have a backflow preventer? IU Health Bloomington Hospital grounds on the drive near the bypass.