City Construction Projects
- Case Date:
- 10/16/2012
i noticed a very dangerous situation that needs to be fixed. on the old part of west 3rd street that is still 2 lanes, beside the cresent donut shop, it is very narrow there, & i noticed that the edge of the street there is crumbling away. when it starts snowing in a month or 2, it will be even more dangerouse, because as the snow accumulates it can form a false shelf effect. in other words, the street there could look wider than it really is, so a driver could easily go over the edge & down into a little creek under there. please fix. thank you
Traffic Related Complaints
- Case Date:
- 10/15/2012
The detectors on Fee Lane and the Bypass do not work. One has to wait the full 80 seconds at the Fee Lane light even when there is no traffic on the Bypass.
- Case Date:
- 10/14/2012
The stop sign at 11th and Grant is down, and people aren't breaking at either intersection.
Potholes, Other Street Repair
- Case Date:
- 10/11/2012
Before bad weather gets here, can you PLEASE repair the pothole on Covey Lane right where it intersects with Thornton Drive? The hole just keeps getting bigger!! Thanks so much!!!
Potholes, Other Street Repair
- Case Date:
- 10/11/2012
There are a few pot holes in the alleys/entrances of our apartment buildings located at: 303/315 E. 8th St and 417 N. Grant St.
Potholes, Other Street Repair
- Case Date:
- 10/10/2012
Address: 2907 Spangle Rd, Bloomingotn. There is a grate near the curb at the end of my driveway. The concrete is beginning to erode around the grate making it hazordous to walk and eventually drive on. I'm afraid someone will sprain an ankle if not repaired. Thanks.
Traffic Signals
Kingston Dr S
- Case Date:
- 10/9/2012
At the intersection of Kingston Drive and 3rd street, the walk signal for crossing 3rd street on the east side of Kingston (for example, from K-mart to Marsh) is malfunctioning. No matter how many times I push the "walk" button, the signal does not show "walk," and it makes this crossing perilous.
Traffic Signals
Frontage Rd
- Case Date:
- 10/7/2012
The traffic signal to turn left / east onto Bloomfield Road (2nd street) after exiting northbound 37 did not change a single time in over ten minutes. Most of the motorists either made U-turns or else turned left illegally onto Bloomfield road when no other cars were coming.
Traffic Related Complaints
300-398 W Gordon Pike
- Case Date:
- 10/7/2012
Gordon Pike between Walnut and Rogers St has been repaved, but not striped and it's hazardous at night, especially when it rains. When will it be striped?
Potholes, Other Street Repair
- Case Date:
- 10/5/2012
The stree sign is down at the South end of Baldwin Drive where it intersects Fenbrook.