Potholes, Other Street Repair
- Case Date:
- 7/25/2023
Lindbergh has been left unfinished for at least 2 years. Can someone please complete the road construction on this stretch of Lindbergh St. that was started long ago. There is road construction going on literally all around here, but yet Lindbergh continues to be ignored. Please complete the project. Thanks!
Potholes, Other Street Repair
- Case Date:
- 7/27/2023
At house # 2028 E 1st Street, there is a pothole at the speed bump.
Potholes, Other Street Repair
- Case Date:
- 7/27/2023
Potholes or pieces of pavement missing near 817 High Street and 1011 High Street.
Potholes, Other Street Repair
- Case Date:
- 7/27/2023
Driving on Covenanter, first going past Pickwick, in the direction of College Mall Rd, there is a pothole just before the intersection with College Mall Rd.
Traffic Related Complaints
- Case Date:
- 7/28/2023
Stop signs ignored
Potholes, Other Street Repair
- Case Date:
- 8/1/2023
there is a street repair which has partially sunk. causing a traffic hazard and impacts one of the artists booths for the 4th street festival.
Thank you
Potholes, Other Street Repair
- Case Date:
- 8/1/2023
#184872 location is near the intersection of 4th and Grand on the south side.
Thank you
- Case Date:
- 8/7/2023
Street light is out on the corner of Rosewood and Tulipwood.
- Case Date:
- 8/8/2023
The street light is out at the corner of Forrester and David. Thank you for replacing it.
Potholes, Other Street Repair
- Case Date:
- 8/8/2023
Large potholes, torn up asphalt, on the city alley way off of 17th street, that runs between DDI detailing and the gas station at 17th and College. This is a city right of way permitting access to the parking lot used by employees of Like Law Group. The damage is so extensive vehicles could be damaged if this is not repaired. I understand the city acknowledges this is on their "alley" but will not repair this for quite some time. If vehicles are damaged I assume we can submit those repair bills to the city. Is that correct?