Potholes, Other Street Repair
- Case Date:
- 9/29/2017
I respectfully request that you paint crosswalks at the corners of Daniel and Forrestor and David and Forrestor in the Hyde Park neighborhood. We used to have crosswalks, but they were covered over on those three corners during recent paving and need to be repainted. Many people cut through the neighborhood on those streets and often roll through the stop signs. The Crosswalk will make it safer for the children and others who cross those streets on the way to Schmalz Park. Thank you for considering this request. Have a wonderful autumn.
- Case Date:
- 9/29/2017
Really need double Yellow line down 10th St between Morton & Rogers. Drivers get confused at the parking lot entrances as to which way 10th St actually goes. With all the new students it is getting worse.
Potholes, Other Street Repair
- Case Date:
- 9/28/2017
Broken pavement
Traffic Suggestions
3051 S Sare RD
- Case Date:
- 9/28/2017
There are no lane markings on most of Sare rd
Sidewalk & Curb Complaints
- Case Date:
- 9/28/2017
The sidewalks throughout Sherwood Oaks are busted up, uneven and there are no curb cuts! Which I thought was required by the ADA. Please address.
Traffic Signals
1201 S Walnut ST
- Case Date:
- 9/27/2017
Left turn arrow for South Walnut onto East Grimes goes green every cycle regardless of whether or not a car is in the turn lane.
- Case Date:
- 9/27/2017
In the north bound lane at the intersection of Grimes and Walnut the turn lane is backed up all the way across Hillside. The left turn light to turn onto Grimes is only long enough for a few car to go at a time. There were 12 cars in the turn lane around noon. Only 3 were able to turn on the green arrow. Thus it would/could take 4light cycles to get through the intersection. I recommend increasing the length of the green turn arrow at peak traffic times. Thank you.
- Case Date:
- 9/27/2017
Not new Lane but requesting bike symbols painted again soon in Park Ridge East to make folks aware and slow down. Great new surface but don't want a highway!! Is residential.
Potholes, Other Street Repair
- Case Date:
- 9/27/2017
The crosswalk marking on 10th Street pavement in front of the Psychology Building on campus is barely visible even in broad daylight. Please replace the white lines/bars. Thanks.
Traffic Signals
1201 S Walnut ST
- Case Date:
- 9/26/2017
In morning particularly, around 7:45a, the timing of the traffic signal at Walnut and Grimes often causes a backup in the northbound lanes of Walnut all the way to Hillside, due to people trying to turn west onto Grimes. Is it possible to re-time this signal? Thank you!