closed #183660
Potholes, Other Street Repair
1025 S Walnut ST
- Case Date:
- 5/3/2023
Gigantic pothole behind 1025 S. Walnut St., in the alleyway.
Gigantic pothole behind 1025 S. Walnut St., in the alleyway.
Street pavement is peeling off, crumbling away and is uneven (trash cans sometimes can not be level on the surface).
Fallen tree branch across Hawthorne Dr. Branches have been cut and pushed to side of street (in front of 1025 and 1019), but need to be cleared off.
Tree limb from street tree on sidewalk
Several potholes at the northwest corner of the circle drive around Showalter Fountain, in front of the Fine Arts building on the IUB campus.
This rut is getting deep enough that the car nearly bottoms out when it hits it.
Sorry forgot to put the address-1115 E. 1st St.
The path between weatherstone and hawthorne, part of the new Hawthorne-Weatherstone Greenway, has not been cleared of snow at all. Even worse, the plows pushed all the snow from Hawthorne into a huge pile blocking the Hawthorne end of the path, so that it is completely impassable. This is totally unacceptable treatment of brand new city infrastructure, which is intended to be a transportation route.
On Thursday March 14, part of this tree came down at 1024 S. Graywell drive due to the strong winds. I reported this thru this system, was notified that the case was assigned to Danna Workman and then I received a notice on March 15, Friday, that the case was closed by Chris Axom and that the debris had been removed. That is 100% not the case. This tree is still down, is still blocking part of the road, is still laying in the common space and is STILL blocking the sidewalk.
Trees next to the bike/ped path have low-hanging branches that need to be trimmed so they don’t hit people in the face.