closed #201231
Potholes, Other Street Repair
1500 E Maxwell LN
- Case Date:
- 2/28/2025
Large pothole.
Large pothole.
From Adams St to Roger St along 5th St there at least 4 overhead street lights out which I observed on the way into town. In addition I observed 3 non-overhead lights out. if there is a time when all the street lights everywhere in the city should be working it is during a dark winter night.
Deep narrow pothole beside square donuts.
Multiple, deep potholes in the entire 300 block of S. Kirby Alley. End to end.
Large pothole capable of popping tires.
The accessible crosswalk signal on the south east corner of South Walnut and East Kirkwood Ave. is not working to alert pedestrians for safe crossing of Walnut Street.
The traffic light at the intersection of Adams St and Bloomfield Rd/Second St. is improperly adjusted. There is very light traffic from Adams St, but the traffic signal is set as if Adams St had similar traffic as Second St/Bloomfield Rd. This problem causes needless traffic backups on Bloomfield Rd/Second St, resulting in increased pollution from vehicles sitting at the traffic signal when there is no traffic from Adams St. Please send someone to view activity at this location, and adjust the signal so that it changes only when there are vehicles waiting on Adams St.
Traffic signal at Bloomfield Road and Adams Street needs attention. The light heading West and East is only holding for about 6-8 cars. There is nobody waiting at Adams and it holds forever creating a backup on Bloomfield Rd.
The traffic signal only lets 6 cars go on Bloomfield Rd with nobody waiting on Adams Street. Then it holds forever for Adams St.
Light timing is horrible at this intersection. Traffic on 2nd is forced to wait a full signal cycle for few (if any) cars on Adams, and it’s been like that for months. Often, the light timing issues also compound with the 2nd and Patterson intersection, which has its own design issues. Today (4/27/2025), the timing was somehow even worse than usual, causing a major backup.