Potholes, Other Street Repair
S Buffstone Ct
- Case Date:
- 4/21/2025
The street at edge of cul de sac is crumbling and the street inside cul de sac is a mess. It hasn’t been replaced in over a decade. Yet you keep raising our taxes. Please fix this street
Excessive Growth
S Buckner ST
- Case Date:
- 6/26/2013
at Buckner & 3rd there are trees covering street sign
- Case Date:
- 10/18/2017
Sidewalk & Curb Complaints
S Ballantine Rd
- Case Date:
- 7/26/2024
Broken sidewalk for at least half a block on east side of Ballantine south of Hunter. A risk to elderly pedestrians like Yours Truly. Would be most grateful for attention to this matter!
Potholes, Other Street Repair
S Bainbridge Dr
- Case Date:
- 2/9/2025
Multiple deep potholes between Ellison Drive and Laura Way.
Potholes, Other Street Repair
S Bainbridge Dr
- Case Date:
- 3/31/2025
S. Bainbridge Drive, perhaps the most important street for Sherwood Oaks after Allendale, has been deteriorating badly ever since I moved to the neighborhood 2 1/2 years ago. It has been patched and patched and patched, but the breakup goes on. Really in need of a general redo.
Potholes, Other Street Repair
S Adams St, Bloomington, IN, USA
- Case Date:
- 1/15/2022
Very large pothole in right lane on S Adams St, before you get to Youth Services
Traffic Signals
S Adams St & W Bloomfield Rd, Bloomington, IN 47403, USA
- Case Date:
- 8/14/2023
The traffic light timing at this intersection is completely off. Adams N/S gets a significant amount of time, even when no traffic is coming, causing backups on 2nd street in both directions. Watch 2 cycles and you'll see it's off.
Traffic Signals
S Adams St & W 2nd St, Bloomington, IN 47403, USA
- Case Date:
- 6/3/2022
The timing of this light is not right. If you are coming off of Adams street, you often have to wait up to 5 minutes when no other traffic is coming down 2nd street.
Potholes, Other Street Repair
S Adams
- Case Date:
- 2/7/2025
Potholes on Allen from Bloomfield to Allen st