Street Lights
E Davis/S Palmer and E Davis/Grant
- Case Date:
- 11/18/2024
Lights at both intersections are burnt out. Our free library located on Davis street, has been vandalized twice in the past month. We feel the lack of light has contributed to the vandalism.
Potholes, Other Street Repair
400 S Morton ST
- Case Date:
- 11/18/2024
Hello,
There are two issues actually. 1) at the corner of Smith and S Morton has a hole on the road is the width of a car. It cause issues for bicycles and cars. It’s been patched up over the years and it’s been worse. 2) i also wanted to mention that there are always weeds growing as a result of the erosion like hole.
Leaf Collection
401 N Morton ST
- Case Date:
- 11/18/2024
Street Lights
400 E Davis St
- Case Date:
- 11/17/2024
Two street lights are out in the 400 block of E Davis St, on the corner of Davis and Palmer, and Davis and Grant. The Little Library located in this block was vandalized twice within last 10 days.
Potholes, Other Street Repair
2700 E Covenanter DR
- Case Date:
- 11/17/2024
Deep pothole in the road in front of the bank.
- Case Date:
- 11/16/2024
During a major storm over the summer, a large trunk of a maple tree growing immediately along 12th Street (city property according to GIS) fell into the road. Duke cleared the tree from the road and reestablished power, but left the waste to sit at the curb. I contacted Duke but they refused to finish cleaning it up. Would appreciate if the city could help with this.
Traffic Signals
300 S Rogers St
- Case Date:
- 11/16/2024
The crosswalk signal on the northwest corner of the intersection of 3rd and Rogers is not displaying the white walking person signal. It does show the orange hand, so the entire unit is not out. But the walk symbol is not working.
Street Lights
301w N Morton St
- Case Date:
- 11/15/2024
Street light flashing at night (on short green post, globe light cover on top)
Traffic Signals
2199 E Moores PIKE
- Case Date:
- 11/15/2024
The north/south stop light at High St/Moores Pike is not programmed correctly. The southbound traffic always goes through the left hand turn signal phase of the light, regardless if there is a car in that lane or not. This creates extended delays for the northbound traffic, especially since there is a no turn on red sign for northbound on High. This is has been like this for months, but it’s especially important now that the Sare Road construction project is rerouting a high volume of cars into High St.
Potholes, Other Street Repair
bloomington
- Case Date:
- 11/15/2024
Potholes - 500-600 block W Dodds -- 800 block W Wylie on the curve -- E Dodds at either Lincoln or Washington -- N Washington near 9th St -- repair before winter sets in