Sewer Problems (Storm Sewers)
- Case Date:
- 8/26/2013
CBU engineering was contacted by Dagnija Berzins who resides at 1509 South Huntington on 7.26.13 regarding damage to her hot water heater as the result of a “flash flood” on 7.23.13. Ms. Berzins said water over-topped the storm ditch and entered her house, damaging her hot water heater in the process. Ms. Berzins quoted $800 as the estimated figure to replace the hot water heater. Ms. Berzins claims the piping designed and installed by the City is too small and therefore, the City is at fault. Legal spoke with Ms. Berzins’ son and instructed him to file a tort claim. CBU indicated to Ms. Berzins we would send someone to look at the pipes and ditch in question.
- Case Date:
- 8/28/2013
Mark Todd from 5874 S. Handy Rd called and said fence and fence post was damaged when work was done. He says he will fix and will bill us, needs to know who to bill and where to send bill to. His phone # is 812-369-8300.
- Case Date:
- 8/28/2013
Owner of Yoga Mala on S College requested a bike rack to be installed oustide of her business.
- Case Date:
- 9/4/2013
bike rack request at Rainbow Bakery, and around 4th/Rogers
Sewer Problems (Storm Sewers)
- Case Date:
- 9/6/2013
storm sewer pipes are collapsing along frontage of property at 890 S Woodscrest
Potholes, Other Street Repair
- Case Date:
- 9/9/2013
Roger Heimer called about pavement sunken at Rusgan & Ramble, Kevin checked this out and determined it is a natural crown in the road.
- Case Date:
- 9/9/2013
Gaven Kelly called about low water pressure, thinks it is due to filter put in meter pit.
- Case Date:
- 9/9/2013
Jason called about water cominjg up, possible main break.
- Case Date:
- 9/18/2013
Basketball goal blocking sidewalk on N. Lincoln St. between 14th & 15th St. Chained to light pole.
Sewer Problems (Storm Sewers)
- Case Date:
- 9/19/2013
6th & Indiana intersection is flooded and Police have closed it. It is raining very hard.I have sent a supervisor there to see if a storm drain is clogged