City Construction Projects
1701-1715 S Walnut St, Bloomington, Indiana, 47401
- Case Date:
- 5/13/2020
Contractors working on the new entrance to Switchyard Park along South Walnut should have the right lane closed. They've got the barrels partially blocking the lane preventing cars from using it when traveling alongside another vehicle in the left lane and the contractors are actually working in the roadway. This is an unsafe scenario for the workers and drivers.
City Construction Projects
1715 E Durham Ln, Bloomington, IN 47401, USA
- Case Date:
- 5/19/2020
NEED TREES AND BRUSH CLEARED NEAR CONCRETE WALKWAY ALONG WINSLOW ROAD
City Construction Projects
3812 S Laura WAY
- Case Date:
- 5/23/2020
S Laura Way is on a signed, much used bicycle route. Going north from S Jamie Ln it goes downhill for 0.2 miles. A bicycle going down this hill will reach a high speed at the bottom where there is a deep pothole. This road hazard could easily damage a bicycle or flip it over. It is located at 3813 S Laura Way. This pothole should be repaired.
City Construction Projects
Miller & Henderson, Bloomington, IN 47401, USA
- Case Date:
- 7/16/2020
For weeks, the contractor doing the concrete curb work at Miller and Henderson has left a deep drop off as you head westbound on Miller to the stop sign unprotected. Of course they have plenty of barrels everywhere else where they filled in the cuts, but not at this the worst one. And every city utility worker coming to and fro from the Miller garage drives right by it.
City Construction Projects
Bloomington City Hall
- Case Date:
- 7/19/2020
Continual speeders on E Morningside. Someone told me our neighborhood association requested traffic calming. Please do something to keep it from being a drag strip. Definitely open to whatever you think best but multiple of us have complained for some time without changes. Thank you for your good work.
City Construction Projects
West 6th Street
- Case Date:
- 7/26/2020
Hello. I'm sorry I don't know side streets. ,If you go down west 6th St. Probably half way, there is three good side section of potholes. It's in areas where it's been pre filled some. Hole are 1 food deep. They have been there well over 1 year. They didn't get like the over night. I ride a Mt bike, they are very dangerous if hit
City Construction Projects
- Case Date:
- 8/5/2020
Pot hole on Rogers road by Sherwood oaks church - dangerous! People are damaging their vehicles. Needs immediate action!
City Construction Projects
1005 S Covenanter DR
- Case Date:
- 8/11/2020
The drainage easement at the south end of Greenwood Dr., where it dead ends into the sidewalk, is blocked with a landslide of debris. The water level rose to 3 feet on either side of the sidewalk and covered three properties adjacent to the clogged drain with water and debris. Thank you for your help. Jim and Debbie Quinn
City Construction Projects
2638 S Isabel CT
- Case Date:
- 8/13/2020
Overgrown tree is dangerously close to our house. Its root system is damaging our driveway, is intertwined with our electrical boxes, and have roots hitting our house. We are requesting the removal of the tree and roots and the replanting of a new one. Please advise as we want to ensure that the overgrowth doesn't overlap with the winter months. There are better pictures, however, I can only upload 1 of them. Thank you.
City Construction Projects
2701 E 3rd ST
- Case Date:
- 8/30/2020
Deep, wide pothole(s) in the roadway due north of the CVS Pharmacy, E. 3rd and College Mall Road.