uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (52129)

closed #179215

Water Utility Problems

1194 E Regency DR

Case Date:
3/10/2022

Water back on thanks. (Couldn't find a way to report that other than creating a new report.)

closed #135339

Traffic Signals

1197-1309 North Fee Lane

Case Date:
11/19/2013

Malfunctioning Traffic Walk Signal. Hasn't gone off/stopped talking since the storms on monday. The signal is at the intersection of 17th street and Fee Lane.

closed #5535

Temporary Signage w/o permit

1199 S College Mall RD

Case Date:
8/9/2010

Five Guys has temp sign no permit

closed #183719

Blocked Sidewalk

1199 S College Mall RD

Case Date:
5/8/2023

There is a sidewalk leading into the South College Mall Road Kroger (directly across from Jackson Creek Dental). Right in the middle of the sidewalk is a Stop Sign embedded in a concrete block. This pretty much makes the sidewalk completely impassable.

closed #188429

Debris Removal (Sand, General Street Debris)

1199 S College Mall RD

Case Date:
5/14/2024

on college mall road in front of five gys resturant, when who ever mows there always leaves the grass in the road along college mall road. it clogs up the sewer drains there . it tends to flood the sometimes.

closed #192271

Sidewalk & Curb Complaints

11th & Maple

Case Date:
7/17/2024

Core hole in crosswalk from fiber project is filled with loose gravel

closed #192374

Sidewalk & Curb Complaints

11th & Maple

Case Date:
7/22/2024

There is a hole filled with gravel (which is somewhat washed out) in the crosswalk at this location. Appears to he leftover from fiber project

closed #192435

Sidewalk & Curb Complaints

11th & Maple

Case Date:
7/24/2024

Third attempt in a week to get the gravel filled hole in the middle of the crosswalk repaired. Appears to be left over from city fiber project

closed #192529

Potholes, Other Street Repair

11th & Maple

Case Date:
7/29/2024

Hole left from fiber project in crosswalk

closed #192851

Potholes, Other Street Repair

11th & Maple

Case Date:
8/13/2024

Gravel filled hole in crosswalk from fiber project has persisted for over a month and through multiple uReports.