closed #183420

City Construction Projects

2711 N Dunn ST

Case Date:
4/13/2023

Workers installing optic fiber cable in the neighborhood have left tools, trash, and a 15-20 foot pipe in our yard. We picked scattered stuff up but can't do anything with the tubing and pipe.

closed #183474

City Construction Projects

E 7th St, Bloomington, IN, USA

Case Date:
4/17/2023

Left on Washington and Lincoln intersection as well. The curb is creating issues because it sticks out to far. Can you please update this And if the vehicle cuts too close vehicle can be caught in the curb. Someone should check police reports and see how often police must do this. Pour gravel inside They need to be filled with concrete because there are weeds in the curb area. Concerned about people falling off of curb area worried about bicyclists falling in. Project feels unfinished

closed #183520

City Construction Projects

W 17th St & N College Ave, Bloomington, IN 47404, USA

Case Date:
4/19/2023

My guess is you are aware that: (1) Driving west on 17th there is a small no left turn sign. (2) Drivers (to be kind) apparently aren't seeing the sign (surely they aren't ignoring it). Anyway, it is causing some big backups at times. I was there twice today and both times someone waited to turn left onto College. Not sure it is solveable, but hopefully there is something.

closed #183770

City Construction Projects

Case Date:
5/11/2023

Lumber on round about Tapp Road going west just before taking 69N towards Indpls. Could be dangerous if it gets on rotunda especially at night!

closed #184157

City Construction Projects

226 S College AVE

Case Date:
6/12/2023

I was walking along the North side of 3rd st with my children and found the railing here was easy to move and break. I can see there were a few stablizing posts but the are not working. It is broken and unsafe and any adult who doesn't know this and leans on this or tips into it could easily fall onto 3rd st. Please fix asap

closed #171300

City Construction Projects

2-54 E Winslow Rd, Bloomington, Indiana, 47401

Case Date:
12/27/2019

Motorists are confused about which lane to be in going westbound on E. Winslow approaching S. Walnut since there is a solid white line dividing the two westbound lanes of the road. I have seen drivers in the right lane turning left onto southbound Walnut.

closed #171454

City Construction Projects

320 W 8th ST

Case Date:
1/15/2020

7th and Union badly needs crosswalk for pedestrian and bike. Thank you!

closed #172047

City Construction Projects

2208 E Arden DR

Case Date:
3/22/2020

Hello -- this cover has a hole in it and that seems dangerous.

closed #172108

City Construction Projects

1525 E Bradshire ST

Case Date:
3/29/2020

Loose wire on power line.

closed #172419

City Construction Projects

1701-1715 S Walnut St, Bloomington, Indiana, 47401

Case Date:
5/13/2020

Contractors working on the new entrance to Switchyard Park along South Walnut should have the right lane closed. They've got the barrels partially blocking the lane preventing cars from using it when traveling alongside another vehicle in the left lane and the contractors are actually working in the roadway. This is an unsafe scenario for the workers and drivers.