Street Lights
1800 E 17th St
- Case Date:
- 3/26/2025
The left turn arrows don't turn on anymore, I'm assuming they were never set back up at the computer box after football season. I work at Athletics and have been meaning to report this for months, Haha. Thanks!
Blocked Street
915 E Miller DR
- Case Date:
- 3/25/2025
Construction and grounds crew here consistently working in the road for the past week or two now with no flagging or traffic control.
City Construction Projects
- Case Date:
- 3/24/2025
Debris from construction left on either side of 11th street and Indiana ave. Needs cleaned up
- Case Date:
- 3/24/2025
Who is responsible for maintaining (or removing) vandalized Ameritech utility boxes? This is one example, but they litter the landscape all over the city.
Debris Removal (Sand, General Street Debris)
721 N Indiana AVE
- Case Date:
- 3/24/2025
Debree from construction left on either side of 11th street and Indiana ave. Needs cleaned up
Potholes, Other Street Repair
1400 S Lincoln ST
- Case Date:
- 3/20/2025
There's a hole in the road next to the sidewalk, just South of the intersection of Lincoln & Wilson Streets, on the West side of the street. It's been there since the crew was installing cable a couple of months ago. It's a hazard!
Traffic Related Complaints
West 1st, between rogers and walker (Hopewell)
- Case Date:
- 3/20/2025
2nd time this week: While traveling west on west first, there is nobody directing traffic around the work being completed for Hopewell neighborhood. One lane of traffic is being blocked, without assistance directing traffic.
City Construction Projects
- Case Date:
- 3/18/2025
Construction for hopewell neighborhood: driving west between rogers and walker. Today is the 3rd time there is a team working without a flagger directing traffic in the street. The work is being done with a bobcat of some kind blocking one lane immediately before a hill, where you cannot see oncoming traffic. I’ve called twice about this already. Thank you!
Blocked Street
West first st 47403
- Case Date:
- 3/18/2025
Construction for hopewell neighborhood: driving west between rogers and walker. Today is the 3rd time there is a team working without a flagger directing traffic in the street. The work is being done with a bobcat of some kind blocking one lane immediately before a hill, where you cannot see oncoming traffic.
I’ve called twice about this already.
Thank you!
Potholes, Other Street Repair
many streets
- Case Date:
- 3/15/2025
The GigabiteNow crews have been drilling round holes about 9 inches in diameter in many streets in town. I've especially noticed it on W 8th and W 6th Streets because I travel those streets daily on my bicycle, but they are on other streets, too. They have not been filling these holes properly and the holes are becoming a hazard for bicycles. They should be require to go back and properly fill those holes so that they leave the surface smooth with no craters or bumps.