closed #163296
Potholes, Other Street Repair
2800-2864 East Covenanter Drive
- Case Date:
- 2/24/2018
Several pot holes along Covenanter right before the curve.
Several pot holes along Covenanter right before the curve.
Pot hole on the west side of Rogers (southbound lane) just a bit south of the Country Club Drive / Tapp intersection.
Homeless living in tents (blue) behind Curry Buick in the Latimer Woods trail area
The pedestrian walk button on the northwest corner no longer seems to trigger the walk sign, even when traffic changes direction. I haven't tested the other buttons, but I haven't seen an east/West walk sign for several days.
This is an Envirosac of cement (concrete construction debris), likely left over from fiber optic installation one year ago. It is at the residence of 2809 E Daniel Street. It was a box of powdered cement, that naturally hardened into concrete, making it VERY heavy. I would like to know who to contact to remove this from the easement? Another neighbor asked the residents to please remove it, however they have not, and they likely do not think it is their place to do so since the fiber optic company fractured their driveway and did not take this box of cement with them when they repaired it. Can you please point me in the right direction. Photos included. Thank you!
N/S running sidewalk on the east side of S Sare Rd is very overgrown, including poison ivy patches. This is a City-maintained path. Would be cool for it to be cut back!
Metal sign near David & Sare leftover from project near Hyde park
I have reported this intersection (Allendale and Winslow) before. Motorists run through the stop signs on Allendale on a regular basis. I see this at least once per week (I live in Sherwood Oaks) and each member of my family observes this as well, so it happens a LOT. Several years ago I was told you were going to install bigger stop signs and put on on each side of the road to make them more visible. Nothing has happened. Perhaps a glowing/flashing stop sign such as they have in other cities? Thank you, Kim
I cannot fathom why, every year, Bloomington literally decides to wait until the very first day of school to start a construction project on any main road leading to a school. Does that sound smart to you?? To ensure that all major roads leading to schools are down to one lane on the first day, almost certainly causing not only students to run late but parents late to work and likely more accidents??? Does that sound smart to yall?? It must because we’ve got construction on 10/bipass, bethel, and N walnut. Do. Better.
Pothole