Potholes, Other Street Repair
S Rogers St
- Case Date:
- 10/20/2025
There was some sort of construction started on Rogers Street near the Community Kitchen/The Warehouse. Metal plates have been left over the holes, and one has shifted significantly, leaving a huge dip and an exposed metal edge that will pop a tire. The plates need adjusted ASAP
Blocked Street
S Rogers St
- Case Date:
- 10/2/2025
On September 29, the road project on 2nd Street near Rogers involved shutting down Rogers just north of 2nd Street. I live in that area, and in order to get to my home, I had to get out of my car twice to move blockages in the road. At the intersection of 3rd and Rogers, there was a barricade that I was able to drive by, but it was barely passable for my car and I had to almost drive up on the curb. Then at the intersection of Howe and 2nd, I had to get out of my car to move construction cones. There were cars going through the intersection and it was dark, so that was not a safe situation. Then when I tried to pull into my drive, there were construction barriers blocking it. I had to get out of my car again and ask a street worker to move it. He was very nice, though. The issue only took place that evening, but I wanted to report it since it was difficult and dangerous.
Street & Traffic Signs
S Rogers & Baywood, Bloomington, IN
- Case Date:
- 10/2/2025
The warning lights on the new pedestrian crossing signal here do not work. I have crossed several times and pushed the button with no results.
Street Snow Removal
S Pickwick Pl
- Case Date:
- 1/6/2025
Snow not plowed until 10:30 this morning, previous years it would have been once during the night and once in the morning
Sidewalk & Curb Complaints
S Pete Ellis Dr
- Case Date:
- 11/9/2024
Someone needs to check out the sidewalk on Pete Ellis Dr at McDonald’s. Hoping it is just temporary.
Traffic Signals
S Patterson Dr
- Case Date:
- 2/21/2025
6am, the light that stays green for Allen st at this intersection is extremely long and there is never another car coming from Allen.
Potholes, Other Street Repair
S Park Square Dr
- Case Date:
- 3/19/2025
Construction of new apartments caused rain to pool on road ( very poor drainage at new site) and many new large potholes along park square drive. Also, flooding occurred during rains that has never happened before at entrance to new apartments under construction.
Drainage or Runoff
S Park Square Dr
- Case Date:
- 3/19/2025
New apartments being build with very poor drainage caused new flooding on park square drive at enterence of complex. Never had flooding in the area before and water runs right down new enterence into drain that is being clogged with mud from construction and is not big enough for area. Flooding caused many new potholes on said road.
Parks & Playgrounds
S Park Ridge Rd
- Case Date:
- 10/4/2025
The only infant swing in the park is broken
Blocked Sidewalk
S Park Ave near Hunter
- Case Date:
- 12/22/2024
Large slab of stone partially blocks sidewalk on West side of Park Ave just south of Hunter