closed #200147
Sidewalk Snow Removal
2748 E 3rd ST
- Case Date:
- 1/13/2025
Simon Mall has not fulfilled their legal obligation to remove all snow from their sidewalks. Photo taken January 12th at 1:47 PM.
Simon Mall has not fulfilled their legal obligation to remove all snow from their sidewalks. Photo taken January 12th at 1:47 PM.
Pothole at traffic light utility access on east side of the west bound lane on Winslow adjacent to stop line. Asphalt surrounding the concrete access point is missing
Light regularly does not change to green for traffic going south even with multiple cars sitting it will cycle through multiple times unless someone needs to turn left.
Traffic light is out at 3rd and Dunn.
there are still multiple pot holes and very rough areas on Leonard springs Rd. This area sees a lot of traffic through out the day because of the construction going on. These areas are going to cause a major accident because drivers are slamming n their brakes to avoid these areas. The area includes , in front of Woodland Springs Apts. all the way down to 2nd street.
Southbound Leonard Springs Rd, "I-69" sign is fully obstructed by trees.
There has been a wire drooping over this entrance to the neighborhood for weeks now. Duke came out and discovered it was not their wire and all they did was put a flag on it. This morning it is now making it impossible to drive through. it is on the ground. I have also contacted Comcast to see if it was there Hanging wire across the street and apparently they have not come out to do anything about it either. This morning it was fine and now it is blocking one of the two entrances to the neighborhood and the other entrance already has a lot of construction going on at it.
There has been some construction on the trails near the Wesley Sports complex. I use the trail to commute to work by bike every day and noted its bad constitution - especially after heavy rain. I had hope for some improvements but the 'closed for construction' signs have been removed and while the trail is now wider it seems like the construction has been stopped half way. The trail is still very sandy / muddy and parts are very soft so that my bike sinks into the sandy surface which makes it very uncomfortable to rise and also somewhat unsafe. Is the construction already done or just paused?
Vegetation is overgrown and blocking sidewalk
Backed up West bound traffic on Bloomfield Road is made a bit worse with the lights here off sensor during construction. The timing is providing more time than needed for cross traffic and turn lane, should be set much longer for E-W Bloomfield. The light further east at Twin Lakes has very sensitive sensor for cross traffic, also adding to the backup, could let the cross traffic wait longer and reset if they escape with a right turn on red to keep the E-W flow going if it can.