Traffic Signals
Frontage Rd
- Case Date:
- 10/7/2012
The traffic signal to turn left / east onto Bloomfield Road (2nd street) after exiting northbound 37 did not change a single time in over ten minutes. Most of the motorists either made U-turns or else turned left illegally onto Bloomfield road when no other cars were coming.
Traffic Signals
Kingston Dr S
- Case Date:
- 10/9/2012
At the intersection of Kingston Drive and 3rd street, the walk signal for crossing 3rd street on the east side of Kingston (for example, from K-mart to Marsh) is malfunctioning. No matter how many times I push the "walk" button, the signal does not show "walk," and it makes this crossing perilous.
- Case Date:
- 10/10/2012
We are writing a application to work with Open311 and would like to use your test server!
Potholes, Other Street Repair
- Case Date:
- 10/10/2012
Address: 2907 Spangle Rd, Bloomingotn. There is a grate near the curb at the end of my driveway. The concrete is beginning to erode around the grate making it hazordous to walk and eventually drive on. I'm afraid someone will sprain an ankle if not repaired. Thanks.
Graffiti
500-550 W Kirkwood Ave
- Case Date:
- 10/10/2012
"Everything for Everyone A"
Potholes, Other Street Repair
- Case Date:
- 10/11/2012
There are a few pot holes in the alleys/entrances of our apartment buildings located at: 303/315 E. 8th St and 417 N. Grant St.
Potholes, Other Street Repair
- Case Date:
- 10/11/2012
On Walnut Street northbound in front of the pet store near BHSS, there is a water/utility cover that is open or raised up in the street. I saw it yesterday, but hit it in the dark this morning.
Potholes, Other Street Repair
- Case Date:
- 10/11/2012
Before bad weather gets here, can you PLEASE repair the pothole on Covey Lane right where it intersects with Thornton Drive? The hole just keeps getting bigger!! Thanks so much!!!
Traffic Related Complaints
- Case Date:
- 10/11/2012
Because of the construction happening on S. Walnut I was recently stopped for almost ten minutes at the intersection of Walnut and Second. This is a road I use daily and I am accustomed to some delays. However, this evening (Thursday, 10/11/12 at about 6:40) the construction crew parked a cement mixer diagonally across the intersection making any driving impossible. There was no warning that this was taking place and no attempt to redirect traffic. After sitting through around 7 light cycles my boyfriend approached the driver at the head of the line and asked if they would mind turning right and going oh of their way so that he cars lined up with us could make our way around he impass. In the future I would suggest scheduling these events so temporary detours may be set up. Expecting citizens to spontaneously adjust to major construction set ups is unreasonable.
- Case Date:
- 10/14/2012
The stop sign at 11th and Grant is down, and people aren't breaking at either intersection.