Traffic Related Complaints
Rogers St & Hillside Dr @ Community Kitchen
- Case Date:
- 10/7/2025
Construction project that was set to begin 8/20/25 started out of nowhere on 10/6/25, putting Rogers to northbound traffic only. If you do try to go northbound, there is to be a flagger at the Novo Nordisk entrance, but this morning there was not one. Traffic backed up going northbound, and traffic was still coming southbound. Thus, things were at a standstill as there was no flagger from Crider & Crider (company logo I noticed on trucks) to direct traffic. Would like to know when this project will last as it didn't start on time and there was no notice that the southbound lane would be completely closed, even to those of us who live in the area.
City Construction Projects
1205 1/2 S Rogers ST
- Case Date:
- 10/7/2025
Someone needs to check on the construction crew working Rogers Street in the Patterson area. They are blocking the sidewalk with their materials on the east side near the warehouse. One of the contractors unexpectedly pulled his truck out onto the street to block a vehicle and then pulled it out aggressively again almost causing an accident. When confronted about this being unsafe he said “I can do whatever I want“.
Drainage or Runoff
2701 E Pine LN
- Case Date:
- 10/2/2025
The asphalt is coming up around the drain and frequently creates blockages that leaves and other debris easily stack on. Then the drain clogs and floods our driveway and mailbox area.
Potholes, Other Street Repair
- Case Date:
- 8/14/2025
I had sent in a request on 5/19/25 Case #202787 reporting that Olive Street needs a concrete curb installed. Due to the excessive rainfall this has caused flooding issues for 1502 S. Olive and the house on the corner of Hillside and Olive (1144 E. Hillside Dr.). I was informed that this was on the paving list and there was plans for an asphalt curb. I called on 6/9/25 and spoke to the Engineering dept. (Iris) about installing a concrete curb instead of asphalt. There is already a partial concrete curb that runs past 1502. It needs to have a concrete curb all the way up the hill so that rain will not flood into the driveway and along the house of 1502, plus it runs past the curb into the yard of 1144 E. Hillside causing flooding in the basement. They have a sump pump now, but it's old and could quit at any time. It's already August and there hasn't been any kind of activity on this street. Do you have an estimated date as to when the street will be paved and the curb installed? Also, there is a construction sign in the yard of 1144 E. Hillside that has been there all summer and would like it to be moved. Thank you for any information you can provide!