City Performance
Rockport Rd
- Case Date:
- 3/11/2025
Potholes: on Rockport Rd starting at the stoplight by the southern hills church to graham Rd. People swerve to miss the potholes they are deep and it's dangerous. Please fill in these potholes. This is very highly traveled road. The potholes being filled would be very appreciated.
Potholes, Other Street Repair
222 E 1st ST
- Case Date:
- 3/10/2025
Right lane going east on 1st st. At stop sign in of 222 east 1st street.
Potholes, Other Street Repair
222 E 1st ST
- Case Date:
- 3/10/2025
Right lane going east on 1st st. At stop sign in of 222 east 1st street.
Potholes, Other Street Repair
1309 N Kinser PIKE
- Case Date:
- 3/10/2025
17th in Kinser on kinser Pike northbound potholes
Potholes, Other Street Repair
1020 N Monroe ST
- Case Date:
- 3/10/2025
potholes northbound on Monroe st in the construction area
Street Lights
1800 E 17th St
- Case Date:
- 3/10/2025
I believe the LEFT turn signal is out on 17th eastbound, when turning LEFT onto Fee Lane.
Traffic Signals
706 S High ST
- Case Date:
- 3/10/2025
The yellow school zone blinking light is not working. If heading south on High st it's right in front of 706 High St.
Street & Traffic Signs
2110 N Angelina LN
- Case Date:
- 3/10/2025
Semis turn down Angelina all week long to try to go to Printpack. Then they realize they can't turn into Printpack and they try to turn around in Roto-Rooter. These semi's have hit our mailbox 3 times now and the most recently damaged our land by backing into it. We understand things happen. We are wondering if a sign could be added onto Angelina (possible near our Roto-Rooter sign) that says there is a semi turn around at the end of Angelina Lane.
Potholes, Other Street Repair
1925 N Kinser PIKE
- Case Date:
- 3/10/2025
Potholes
Potholes, Other Street Repair
Jordan & 2nd
- Case Date:
- 3/10/2025
Pothole in intersection at 2nd & Eagleson