Sidewalk Requests
4212 W Glen Oaks DR
- Case Date:
- 10/16/2023
I’m writing to request the completion of unfinished sidewalks and the addition of some crosswalks on the west side of Bloomington.
The first is an unfinished stretch of sidewalk along the east side of Curry Pike from Industrial Avenue to the intersection of 2nd St./45. The sidewalk dead-ends before reaching the intersection, and there is no crosswalk at the intersection to allow pedestrians to cross safely from the north side of 2nd St./45 to the south side, or vice versa.
The second is a stretch of sidewalk along the north side of 2nd St. from Liberty Drive to Industrial Avenue. This sidewalk is overgrown and near unusable and dead-ends before reaching Industrial Avenue. Moreover, the intersection at Liberty Drive and 2nd St. has a crosswalk on only the north side (going east-west) and does not allow pedestrians to cross safely from the south to north side of 2nd St., or vice versa.
Lastly, the sidewalk on the west side of Curry Pike does not connect between Lamplighter Mall Ct. and Glen Oaks Drive, and connecting these stretches of sidewalk would provide better access to 3rd street and the neighborhoods along Curry Pike.
It would be much appreciated if the city could complete these stretches of sidewalk and make the area more walkable for those of us who do not have other modes of transportation or who simply prefer to walk the shorter distances to reach businesses and services that are close to home.
Best,
Marie
Sidewalk Requests
3951 E 10th St, Bloomington, IN 47408, USA
- Case Date:
- 10/9/2023
Sometimes, I use to walk back home. I use 10th street to reach my home, but there is a short section of 10th street from around 3951 E to Meadow Park that does not have a sidewalk. It is really dangerous to walk in the road because it is not a straight rode and drivers cannot see you.
Sidewalk Requests
1727 S Maxwell ST
- Case Date:
- 9/27/2023
Sidewalks on Maxwell end just before my house and I would like to request that they be extended. I have small children and we live right at Miller and Maxwell, which is an active intersection with a lot of folks turning from Miller towards my house. My kids enjoy riding their bikes, but we don't ride nearly as often because I worry about them going out into the street. I would like to request that sidewalks be extended down at least to cover my house.
- Case Date:
- 9/20/2023
Driveway by my house is cracked, but new sidewalk repairs do not seem to be including it. Anyone I can talk with about this?
Sidewalk Requests
1901 E Ruby LN
- Case Date:
- 9/13/2023
There is one block of Ruby Ln (my block) with no sidewalk. Please consider converting the huge culvert that runs along the S side of Ruby from Nancy to High into a storm drain, and putting a sidewalk over the drain.
Sidewalk Requests
102 N Clark ST
- Case Date:
- 9/7/2023
We need sidewalks on East 5th street in Green Acres. Students and other folks are always walking on the street. This is dangerous.
Sidewalk Requests
500 E 11th ST
- Case Date:
- 6/26/2023
Could the City install a sidewalk along the west side of Dunn between Cottage Grove and 12th Street? There are also a couple sections in that stretch where there isn't even a sidewalk on the east side of the street, and a lot of people walk down that street even though it is only one-way.
- Case Date:
- 6/13/2023
Just wanted to pass along my thanks for sidewalk repair in Blueridge. The company doing the work, Groomers, has done top notch and quality work on sidewalk repair. I’ve seen sidewalk repair that was sub par, but the work Groomers is doing is the best quality I’ve seen. I don’t know anyone who works for them but wanted to let you know these guys are doing a good job. Thanks
Sidewalk Requests
2128 E 5th ST
- Case Date:
- 5/11/2023
We really need sidewalks on E 5th Street in Green acres. Many people walk on the street to IU.
Sidewalk Requests
3391 S Burks CT
- Case Date:
- 4/28/2023
Sidewalks needed on Walnut St. Pike between Winslow and Rhorer Rd. There are brief stretches of sidewalk on different sides of the road, forcing pedestrians to choose between making a dangerous street crossing to stay on a sidewalk or to walk in a ditch. Winslow and Rhorer are both pedestrian heavy areas. This issue will only get worse when the new subdivision is built.