closed #111979
Other
E AZALEA DR
- Case Date:
- 5/15/2000
Caller complained that some of the houses being built in Walnut Creek did not have siding installed all the way to the ground.
Caller complained that some of the houses being built in Walnut Creek did not have siding installed all the way to the ground.
WANT YARD REPAIRED IN REAR WHERE CBU WORKED
WOULD LIKE YARD REPAIRED WHERE CBU PUT IN SEWER MAIN RECENTLY
CUT WATER LINE
METER LID IF OFF, METER SET UP TOO HIGH 6"
WORK DONE BY A SUBCONTRACTOR AND COMPLAINTS TAKEN BY INSIGHT PERSONNEL. SEE ATTATCHED LETTER.
The new audible signals downtown, especially at the intersection of 5th and Walnut, drive her crazy. She couldn't concentrate when reading on the square at lunch, and the insistence of the sounds drove her nuts. She likes the idea of accessbility for those who are visually impaired, but thinks this can be accomplished in a different manner.
WANTS VALVE BOX RAISED ASAP
WANT ROCK & CRUSHED STONE REMOVED & TOP SOIL PUT BACK DOWNLIKE IT WAS
Ms. Taylor co-owner of the Book Corner called to complain the audible pedestrian signals on the north east corner of Kirkwood & Walnut. She finds them very disruptive and unneccesary. She has a space for rent above her shop and she cannot lease it due to the high noise level of the audible signals.