Potholes, Other Street Repair
1830 W 17th ST
- Case Date:
- 7/13/2017
When does the city intend on finishing this section of road? Ever since the bridge was completed it doesn't look like any work has been done at all to finish this one bit of road at all, and it's been months! East-West traffic is already a nightmare for this county because of the construction on I-69, Second, and Third Street, and yet the one route that can really act as a good alternate route to help alleviate some of that traffic is hampered by this abandoned project. While the detours tell people to go down towards 11th Street, we all know that way too many people are cutting through the neighborhood where there are plenty of children trying to play outside. This is nothing but ridiculous!
Potholes, Other Street Repair
112 1/2 S College AVE
- Case Date:
- 7/13/2017
Complaint of a dip in the road on the crosswalk when crossing College Avenue as a pedestrian. Caused her to trip, and wants spot fixed. Can be reached between 8 and 4 at number listed in report.
Potholes, Other Street Repair
3355 E Boltinghouse RD
- Case Date:
- 5/6/2017
Hello I realize this is county but I could not find where to submit that. Boltinghouse road has several large potholes, some are seriously crater sized. Seemed to of gotten worse after heavy rains. Thank you
Potholes, Other Street Repair
320 N College AVE
- Case Date:
- 5/1/2017
Potholes-numerous in the alley
Potholes, Other Street Repair
624 W 17th ST
- Case Date:
- 3/22/2017
on 17th street going towards the round about, before pawn shop. It caused damage to the right front of my car. I am waiting to hear exactly what the damage is that was done.
Potholes, Other Street Repair
2403 N Browncliff LN
- Case Date:
- 3/6/2017
There is a dip in the road near this location and a pot hole has developed. The surface of the road needs to be raised to prevent the pot hole from reappering. It was fixed last year but is back again.
Potholes, Other Street Repair
3425 E Longview AVE
- Case Date:
- 1/26/2017
While we do have a pothole at the edge of our driveway that extends into the culdesac and city street one which we live, I'm reporting here a request to extend the curb in the culdesac to the area in front of our house. I have sent in a few requests over the years to the City of Bloomington to get the curb extended and have never heard back. We regularly have folks parking in our yard (probably inadvertently), causing further erosion issues in our yard. Thank you.
Potholes, Other Street Repair
1123 W 7th ST
- Case Date:
- 1/24/2017
Potholes in gravel alley. They hold water allowing mosquitoes to breed.
Potholes, Other Street Repair
2825 N Dunn ST
- Case Date:
- 1/20/2017
Pothole and street crumbling into bits of gravel.
Potholes, Other Street Repair
823 N Maple ST
- Case Date:
- 1/18/2017
Miller Pipeline, a subcontractor of Vectren, repaired a gas line on 1.11.17 and in the process destroyed the sidewalk and road. The items require repair.