closed #205285
Potholes, Other Street Repair
422 E 11th ST
- Case Date:
- 8/26/2025
The east/west alley to the south of the building is overgrown and we can not access our garage enterance.
The east/west alley to the south of the building is overgrown and we can not access our garage enterance.
There is a spot in the street at Post Road and Meadowlark where it was cut into while the street light on the other side was installed. It was patched after the installation but now it has partially collapsed and may get worse.
Eastbound lane there's a good sized pothole. Thanks as always for the great work y'all do!
The city alley along the north side of our home on 1006 South Grant Street, has a few large, deep potholes. They need to be filled in, new gravel to level with rest of alley. These potholes were created by utility trucks when each did some work in the spring. These heavy trucks (city tree trim, utility repair, cable repair, etc.) park to repair at the poles and their continued heavy weight created deep holes. Driving down the alley (which daily serves 5-6 drivers in three adjacent homes) has become very challenging. One can't veer easily to the side due to alley being narrow - and no one wants damage to our cars from suddenly hitting potholes! This gets exacerbated in rainy, muddy weather when you can't easily see potholes. Thank you for your attention.
Big hole in pavement at South side of house number 512 S. Rogers street. On Rogers street as moving into alleyway/SPAAH parking lot
There are multiple potholes in the right turn lane heading north on Rogers St about to turn right on 3rd St.
Potholes on W. 1st and Wylie/Euclid from big trucks/heavy traffic in demolition work past few years. Right by parking lot for rental houses.
Several potholes are continuing to get worse at this intersection. When turning onto Windsor Dr. from Arden, it is impossible to avoid these jokes without traveling into the opposite lane. Hank Duncan (City Bicycle Coordinator) told our subdivision last fall that the City would be redoing the streets during the Greenway project, but it has yet to be started. I left a voice mail for him 2 weeks ago, asking about the plan, but he has not responded. Please contact me.
Signs indicating that road construction is ahead have been here for months. No construction is taking place. These signs need to be removed. Leaving unnecessary warning signs up is irresponsible since it conditions people to ignore them.
See case #204982. Response was dismissive. "..will be compliant when paving is completed..". *When* will that happen? This year? The areas surrounding the ramps are DANGEROUS, especially at Grant/Cottage Grove. Why start a project if it cannot be completed at the time?